My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005197
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
1525
>
2600 - Land Use Program
>
PA-0500424
>
SU0005197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 1:53:48 PM
Creation date
9/6/2019 10:30:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005197
PE
2626
FACILITY_NAME
PA-0500424
STREET_NUMBER
1525
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00315008
ENTERED_DATE
7/13/2005 12:00:00 AM
SITE_LOCATION
1525 E JAHANT RD
RECEIVED_DATE
7/12/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\J\JAHANT\1525\PA-0500424\SU0005197\APPL.PDF \MIGRATIONS\J\JAHANT\1525\PA-0500424\SU0005197\CDD OK.PDF \MIGRATIONS\J\JAHANT\1525\PA-0500424\SU0005197\EH COND.PDF \MIGRATIONS\J\JAHANT\1525\PA-0500424\SU0005197\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions <br /> Use Permit Application No PA-0500.424 was approved_by the Planning Commission on . The; <br /> effective date of approval �s This`approval will expire on.. which �s :18 months from the <br /> effective date of approval, unless {1) all'Condi#ions of Approval have been:comphed <br /> necessary building permrts have been issued and remain in force,annecessary:perriiits from- <br /> other agencies Have been issued and remain in force a <br /> Unless otherwise specked,all s of Approval antl ordinance requirements shall be fulfilled: <br /> pnpr to the establishrYaent of`the us,'e and#the issuance'of ariy building permits `Those:Conditions.: <br /> folldwed: by a:' 'ection Number have been iden'�ified as ordinanca;requirements pertment;to this; <br /> application. �Okiinance requirements cannot be:moclifie'd, and other ordinance'`requiretnents may. <br /> apPly <br /> 1.-. COMMUNITY DEVELOPMENT DEPARTMENT(Staff-Contact:,Rayrhond.Hoo,468-31.64) <br /> a. BUILDING PERMIT: 'Subrnit'an "APPLICATIOWCONIMERCIAL.BUILDING PERMIT'. The Site <br /> Plan required as a part of the.buildin0'pe6Nt must be prepared by a registered civil:engineer.o'r <br /> licensed:architect. This Plan m ust show drainage,driveway access.details including gates, on-site. <br /> Parking, landscaping, signs,`existing and proposed.utility services, and:grading (fefer'to the "SITE <br /> PLAN CHECK LIST' for-detail§). A fee is 'required for the-Site Plan review. (Development Title . <br /> Section 9-884). <br /> b. APPROVED USE: This approval is for a large winery with a processing capacity of 40,000 tons to <br /> be built out over 20 years in 7 phases (Use Type:Wineries and Wine.Cellars -Winery, Large) as <br /> shown on the Plan dated July 1, 2005. The project includes tank capacity of 15.7 million gallons and <br /> 9 buildings totaling 118,283 square feet. Included with the winery are: <br /> Phase One (all building permits shall be obtained within eighteen (18) months of the date of <br /> approval)- <br /> 1. 23,667 square foot building for a tank farm and storage <br /> 2. two settling ponds <br /> 3. two wetlands/water treatment ponds <br /> 4. 960 square foot office <br /> 5. 960 square foot caretaker residence <br /> 6. ramp and dump station <br /> 7. grape presses <br /> 8. scale house <br /> 9. vineyards <br /> 10. parking lot <br /> Phase Two: <br /> San Joaquin County PA-0500424/Lange <br /> Community Development Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.