Laserfiche WebLink
STANDARD PROVISION AND REPORTING REQUIREMENTS" _5_ <br /> Waste Discharge to Land <br /> years from the date of the sample, measurement, report, or application. This period may be <br /> extended during the course of any unresolved litigation regarding this discharge or when <br /> requested by the Regional Board Executive Officer. <br /> Record of monitoring information shall include: ' <br /> a_ the date, exact place, and time of sampling or measurements, <br /> b. the individual(s) who performed the sampling of the measurements, <br /> c. the date(s) analyses were performed, <br /> d. the individual(s) who performed the analyses, <br /> e. the laboratory which performed the analysis, <br /> f. the analytical techniques or methods used, and <br /> g. the results of such analyses. <br /> 4. All monitoring instruments and devices used by the dischiarger to fulfill the prescribed <br /> monitoring program shall be properly maintained and calibrated at least yearly to ensure their <br /> continued accuracy. <br /> 5. The discharger shall'maintain a written sam' pling'program sufficient to assureconipi ance with <br /> the terms of this Order. Anyone performing sampling on:behalfof the discharger shall be <br /> familiar with the sampling plan. <br /> 6. The discharger shall construct all monitoring wells to meet or exceed the standards:stated in the <br /> State Department of Water Resources Bulletin 74 81 and'subsequent revisions_arid.shall comply <br /> with the reporting provisions for wells required l y Water Code Sections 13750 through 13755.22 <br /> D. Standard Conditions for Facilities Subject to California Code of Regulations,Title 23, <br /> Division3, Chapter 15,(Chapter 15) <br /> s <br /> 1. All classified waste"management units shall be designed under the direct supervision of a <br /> California registered civil engineer ora California certified engineering geologist. Designs shall <br /> include a Construction Quality Assurance Plan, the purpose of which is to: <br /> a. demonstrate that the waste management unit has been constructed according to the <br /> specifications and pians as approved by the Board. <br /> b. provide quality control on the materials and construction practices used to construct the <br /> waste management unit and prevent`the use of inferior products and/or materials Which do <br /> not meet the approved design plans or specifications. <br /> .2. Prior.to the discharge of waste to:any classified waste management unit, a Califorr'a registered <br /> civil engineer or a.California certified engineering`geologist must'certify that the waste <br /> management unit meets the construction or prescriptivestandards and performance goats in <br /> Chapter 15, unless an engineered alternative has been approved by the Board_;In the case of an <br /> engineered alternative,the registered civil engineer or a certified engineering geologist must <br />