Laserfiche WebLink
HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of <br /> (e.g, siren, public address system, verbal VERBAL ORDERS <br /> orders, etc.) <br /> EVACUATION ASSEMBLY AREA(S) (9) PARKING LOT <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE USE <br /> (10) LAB <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th mile of our facility. <br /> Names of hospitals, schools, and day-care centers within 118th mile of our facility are also shown. This information <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH OPEN SPACE EAST OPEN SPACE <br /> i <br /> SOUTH OPEN SPACE WEST OPEN SPACE j <br /> SPILL CONTROL PROCEDURES SECTION <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> SPILL CONTROL LEADER (12) RANDALL LANGE <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br /> DAVID AKIYOSHI ALFONSO RAMIREZ TOM COLLINS <br /> i <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) i <br /> his business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br /> needed equipment are shown on the facility map.At a minimum our business must isolate the area of the spill and <br /> make notifications. <br /> SPILLS OF LIQUID MATERIALS <br /> Plug and Patch Container ` Build Retention Dike <br /> _a Remove Sources of Ignition 7 Position Container so as to Stop Leak <br /> Reduce Pressure in Container/System __ Isolate Area and Make Notifications <br /> �'. Neutralize Spilled Material Secure System Valves and Closures <br /> Shutdown System Involved / Apply Absorbent Material to Spill Area <br /> N/A <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> [] Shut Off Valves/Systems Cover Spill to Prevent Spread <br /> Ventilate Area of Release Neutralize Spilled Materials <br /> Ll Reduce Pressure in Container/System Position Container so as to Stop Leak <br /> 71 Suppress Vapors with Water ❑v Place Spilled Material into Drum or Bag {I <br /> 71 Isolate Area and Make Notifications Isolate Area and Make Notifications 1 <br /> 0 Remove Sources of Ignition 0 N/A <br /> f? j <br /> http://sj oesdata.org/gp—HMMP_detail.lasso?-Database=transaction+Plan+File&-Table=ed... 1/29/2008 <br />