Laserfiche WebLink
op4p.ly. APPLICATION - LOT LINE ADJUSTMENT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: <br /> 9�iF ORS <br /> PROPOSED PARCELS <br /> Existing Square Proposed Square <br /> Parcel Number Existing or Proposed Use of Parcel Footage or Acreage Footage or Acreage <br /> 1 vineyard 99.1 Acres 101.1 Acres <br /> 2 vineyard 28.0 Acres 28.0 Acres <br /> 3 vineyard 55.9 Acres 53.9 Acres <br /> 4 residential 2.0 Acres 2.0 Acres <br /> SITE IMPROVEMENTS AND SERVICES <br /> Water <br /> Annex-Formation Distance to Public <br /> Public Water Service Provider Required Water Feet <br /> Proposed[:1 <br /> Existino ❑ <br /> Private Water R] Existin2 Well New Well ❑ Well Replacement ❑ <br /> Sewage Disposal <br /> Public Sewage Ann tion Distance to Public <br /> Disposal Service Provider Re uired Sewer Facility <br /> Proposed❑ <br /> Existing ❑ <br /> On-site Sewage <br /> Dis osal Existing Se tic System New Septic System ❑ Other ❑ <br /> Storm Drainage <br /> Public Storm <br /> Drainage Service Provider(if Public) Annex-Formation Terminal Drainage Detention-Retention <br /> Proposed❑ I Required to: Ponds <br /> Existing ❑ <br /> Private Storm <br /> Drainage 21 On-site Retention Ponds ❑ Natural Drainage/No Chane D Other ❑ <br /> Electricity Telephone Service <br /> Distance to <br /> Service Provider Service Service Provider Distance to Service <br /> PG&E Adjacent AT&T Adjacent <br /> School Service Fire Protection Service <br /> Service Provider School Distance to Elem Service Provider Distance to Fire Station <br /> Lodi Unified School District 5 miles Woodbridge 5 miles <br /> Existing Roads <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> Lower Sacramento Road 80' 30' Yes ❑ No El Yes❑ No El <br /> Jahant Road 40' 25' Yes ❑ No 0 Yes❑ No 0 <br /> Proposed Roads <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> None Yes❑ No❑ Yes❑ No❑ <br /> Yes❑ No ❑ Yes❑ No ❑ <br /> FADEVSMPlanning Application Forms\ Page 4 of 7 <br /> Lot Line Adjustment.doc.(Revised 6-4-04) <br />