My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004095
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
17300
>
2600 - Land Use Program
>
PA-0200182
>
SU0004095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/6/2019 10:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004095
FACILITY_NAME
PA-0200182
STREET_NUMBER
17300
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
17300 JAHANT RD
RECEIVED_DATE
8/2/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\APPL.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\CDD OK.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\EH COND.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN—SOLARI PIT 2002 <br /> George Reed,Inc. <br /> Page 4 <br /> JL DESCRIPTION OF PROPOSED MINING OPERATION continued <br /> B. Estimated Production Schedule <br /> PHASE I: Product Commotion Reclamation <br /> ±30 Acres 334,000 CY S/G 2004-2007 2009 <br /> 500,000 CY O/B <br /> PHASE II: <br /> ±30 Acres 334,000 CY S/G 2007 -2010 2012 <br /> 500,000 CY O/B <br /> PHASE III: 332,000 CY S/G 2010-2013 2015 <br /> X29 Acres 500,000 CY OB <br /> PROJECT TOTALS: 1,000,000 CY S/G <br /> 1,500,000 CY O/B <br /> NOTE: Annual Average Mining Quantities- 10 Acres/Year <br /> 166,667 CY Overburden/Year <br /> 111,333 CY Sand& Gravel/Year <br /> G C. Mining Plan <br /> 1. Operating Plan <br /> Excavation will commence within IS months after obtaining a permit and will terminate with total <br /> reclamation within 11 years, dependent upon demand for materials. Excavation occurs approximately <br /> 180 days in a year. Weather conditions and market factors can alter this approximation. Excavation <br /> activity typically occurs between March—October each year. Excavation will be limited to a weekly <br /> schedule of Monday—Friday, 6:00 a.m. to 6:00 p.m., except during periods of declared national, state, <br /> or county emergency or inclement weather. <br /> 2,3.Topsoil 1 Overburden <br /> Topsoil / Overburden is stripped, set aside temporarily, then replaced concurrent with excavation. <br /> There will be no stockpiles. Excavation is by the open pit method commencing at the Northeast corner <br /> of Phase I, moving in a Westerly direction, then returning in a West to East configuration. Excavation <br /> depths average f25'. Overburden ranges in depth from 0' to f15', with sand and gravel depths <br /> averaging from±7' to f10'. <br /> Equipment to be used at the project site consists of: <br /> ■ Scrapers/Dozers to remove overburden <br /> ■ Backhoe/Excavator to remove sand and gravel <br /> ■ Trucks to transport materials to the existing processing facility on the North side of the <br /> Mokelumne River. <br /> ■ Motor Grader and Scraper to level and contour site for final reclamation <br /> ■ Water Truck to spread water within project area for dust control <br />
The URL can be used to link to this page
Your browser does not support the video tag.