Laserfiche WebLink
:k <br /> REPO RT w Quarry Excavation <br /> STAFF <br /> A iication Information <br /> Owner: George Reed, Inc. <br /> Applicant: George Reed, Inc. <br /> File Number. PA-02-182 feet of State Route <br /> Location: Located approximately AtkinsORoad�orth northwest of Clements88, directly north of <br /> the north terminus <br /> Address: 23813 N. Mackville Road,Clements <br /> G Community: None <br /> AI <br /> General Pian: A G APN: 019-220-40 <br /> Zoning: Parcel Size: 89 acres <br /> Project Size. 88 acres <br /> Bottle and Truck Sewage Disposal: Portable Septic <br /> Water Supply: 100-Year Flood: Yes <br /> Storm Drainage: on-site <br /> Williamson Act: Yes Supervisorial District: 4 <br /> Staff: <br /> Chandler Martin CEQA Determination: Negative Declaration <br /> Protect Descri tion <br /> This project is a Quarry Excavation to remove <br /> app <br /> sxly verea period one sof 11 years, <br /> llion cubic ar Each rphase incd <br /> includes <br /> graves from approximately 89 acres in phase <br /> approximately 30 acres and will take three to four years to complete. George Reed, lnc., is extracting Isc nt <br /> and graves from an existing quarry (QXnd <br /> -99-02) on a contiguous parcel east of the project site. The app <br /> at the exising <br /> expects that quarry to be depleted in 2004 <br /> or 2005.of the Mokelumnee RivfertefMls aterials be wilpl rocessed be hauled to that#ct I ty <br /> processing facility located on the Horthside to <br /> over an existing bridge. Na public roads will be used in the hauling Watert fordust suppressionwillwill the <br /> be <br /> P <br /> existing processing center. Bottled drinking water will be supp per year, <br /> provided from the existing processing facility. Excavation is to occur approximately Fri days p y <br /> typically between March and October. eNormal {ours o he stable tiiron are <br /> wi thin a waterwaMonday y. The excavation w!1 be <br /> 6:00 p.m. Excavation will not take plat <br /> a minimum of 100 feet from the Mokelu c�ajm Id orchards,er and a the applicant proposes oinimum of 50 feet from h construct ah2-botpx.t 40 <br /> ensure against possible flooding of the re <br /> foot berm with a minimum top elevation of 86 feet above sea level between the river and the project site. <br /> Sixty-eight acres of the site are planted in walnut orchard. The site will be reclaimed to walnut orchard. <br /> opsoil and <br /> r Designated topsoil and overburden stockpile and c apcontinuously r pllaced as the excavation pr cveeds. tWithin two <br /> overburden will be temporarily set aside walnut <br /> years fallowing the end of each paputhe phase eline system that currently furnishes shes water to thetadjacent <br /> will be installed and connected to pump <br /> reclaimed parcels. <br /> Recommendation <br /> Approval. This project is consistent with the <br /> 2000.General Plan and Board Order B-00437, pertaining to the <br /> 1 <br /> General Plan 2010 Review, adopted April , <br /> PA-02-1821Reed <br /> San Joaquin County Page 1 <br /> Community Development <br />