Laserfiche WebLink
�l <br /> EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br />` approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1415.3[d]) <br /> g. `, PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> I� otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section 9- <br /> 1415.3[e]) <br /> h.II HOURS OF <br /> OPERATION: Plant operations shall normally be carried on during the hours from 5:00 <br /> - .3 <br /> 'j <br /> a.m.to 9:00 p.m. (Development Title Section 9 1415 [f]) <br /> i. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of an <br /> excavation, the topsoil shall be replaced and the site leveled in conformance with the excavation <br /> �i permit. {Development Title Section 9-1415.3[g]} <br /> j. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br /> 9-1415.3[h]) <br /> k.11: HEALTH CONSIDERATIONS: This quarry excavation shall: <br /> I (1) Not cause health or sanitary hazards and shall not crate conditions which will cause the breeding <br /> i' or increase of mosquitoes, rodents, or other pests. <br /> (2) Provide an approved potable water supply for all employees. <br /> j <br /> {3j Provide approved toilets for all employees(chemical toilets are acceptable). <br /> (4) Provide handwashing facilities on or near the approved toilets. (Development Title Section 9- <br /> 1415.3[l)) <br /> SETBACKS No excavation shall take place within twenty-five (25)feet of any property line or right- <br /> of-way (nor within the allowed slopes adjacent to said twenty-five (25) foot setback), unless the <br /> II elevation prior to excavation is more than that of the abutting property, in which case the elevation <br /> ?I within said twenty-five (25)foot setback shall at no time be less than that of the abutting property, at <br /> the property line. (Development Title Section 9-1415.351) <br /> to temporary interior cut slopes (i.e., working slopes <br /> m. SLOPES: The following provisions do not apply <br /> i that do not fall within any of the criteria listed below). Temporary interior cut slopes shall comply with <br /> !I e Federal OSHA Code of Regulations, as applicable. <br /> the Cal OSHA Code of Regulations and/or th <br /> (Development Title Section 9-1415.3Ik]) <br /> j� (1) Terracing Required. All slopes over fifty (50) feet in height shall be terraced with a maximum <br /> vertical distance between terraces of fifty(50)feet. Each terrace or bench shall be a minimum of <br /> twelve(12)feet wide. <br /> I <br /> (2) Terrace DServices s on plans <br /> all for as part of thell be Reclamat Reclamation Planor approval to <br /> Developmentthe <br /> PA-02-1821Reed <br /> San'Joaquin County Page 6 <br /> Community Development <br /> t <br />