My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004095
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
17300
>
2600 - Land Use Program
>
PA-0200182
>
SU0004095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/6/2019 10:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004095
FACILITY_NAME
PA-0200182
STREET_NUMBER
17300
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
17300 JAHANT RD
RECEIVED_DATE
8/2/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\APPL.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\CDD OK.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\EH COND.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Borges reviewed Environmental Health Department's requirements. <br /> 11:00 a.m. 5. MAJOR SUBDIVISION APPLICATION NO. PA-0200027 <br /> JJ (CIO FOOTHILL ENGINEERING).- A Major Subdivision application <br /> to subdivide 42 acres,into 17residential lots of approximately 2 <br /> acres each. The subdivision'will bejreferred to as "Schulz Estates". <br /> Located on the northwest corner of Woodson Road and State <br /> Route 99 West Frontage Road, north'oflodi (005-160-28; Address: <br /> 4200 East Woodson Road, Acampo). <br /> Jennifer Jolley, Associate Planner; Ervin Rifenburg; Foothill Engineering and Robert <br /> Schulz of Schulz Brothers Inc. were present for this item. <br /> Ms. Jolley introduced the project. <br /> Mr. Rifenburg indicated on the map where and how he would like the masonry wall <br /> installed. Mr. Rifenburg also indicated that the wall would have to be constructed on an <br /> individual basis. The location of the wall will depend on the location of the house on the <br /> lot. <br /> Mr. Rifenburg indicated that the applicants have chosen to provide the water supply for <br /> agriculture for the Loss of Agricultural Land mitigation measure. <br /> Mr. Karam reviewed the Public Works Department requirements. <br /> Ms. Jolley indicated that secondary access will need to be shown on the site plan. <br /> Mr. Borges reviewed Environmental Health Department requirements. <br /> Ms. Jolley indicated that the Planning Commission is tentatively scheduled for <br /> September 19, 2002. <br /> Ms. Jolley suggest that Mr. Rifenburg contact Mr. Dalton regarding the Fire Code <br /> requirements. <br /> The meeting was adjourned at 11:35 a.m. <br /> THE DEVELOPMENT COMMITTEE CHANDLER MARTIN <br /> CHAIRMAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.