My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004095
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
17300
>
2600 - Land Use Program
>
PA-0200182
>
SU0004095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/6/2019 10:31:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004095
FACILITY_NAME
PA-0200182
STREET_NUMBER
17300
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
17300 JAHANT RD
RECEIVED_DATE
8/2/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\APPL.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\CDD OK.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\EH COND.PDF \MIGRATIONS\J\JAHANT\17300\PA-0200182\SU0004095\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Final slopes to a maximum of one (1) horizontal foot to one (1) foot vertical may be <br /> maintained under water(beginning five 151 feet below the lowest water table on the property <br /> experienced in the preceding three (31 years) when site-specific geologic and engineering <br /> analysis demonstrate through a slope stability analysis that the proposed saturated slopes will <br /> have a minimum slope stability factor of safety as required in Section 9-1415.2(k)(4); <br /> vi) Fill Slopes. Fill slopes shall be constructed consistent with recommendations from a qualified <br /> civil/geotechnical engineer based upon site-specific geologic conditions; <br /> n) FENCING: Fencing four (4) feet in height consisting of not less than three (3) strands of barbed <br /> wire,or an approved equivalent,shall be placed around the excavation area where slopes steeper than <br /> two(2)feet horizontal to one(1)foot vertical are maintained. Six(6)foot high security fencing or an <br /> approved equivalent shall be required where slopes steeper than two(2)feet horizontal to one(1)foot <br /> vertical are created, if the proximity of such slopes to residential uses or other uses involving a <br /> concentration of people so warrants.(Development Title Section 9-1415.3[t]) <br /> o) PONDING: All water utilized in the plant operation shall be disposed of behind a closed dike. <br /> (Development Title Section 9-1415.3[n]) <br /> p) EXCAVATION/RECLAMATION SCHEDULE The reclamation plan shall show the phases of <br /> excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> point of time a maximum of one phase is being reclaimed while one phase is being excavated. <br /> (Development Title Section 9-14153[o]) <br /> q) TIME LIMITATION: The Quarry Excavation Permit shall expire 11 years from the efI'ectve date <br /> of approval. <br /> r) ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by <br /> the County to ensure compliance with the conditions of the permit and the reclamation plan. The <br /> County may use professional services as provided for in Section 9-240.11. The consultant shall be <br /> selected by San Joaquin County. Upon completion of the annual inspection,the person in charge of <br /> the mining operation shall submit to the State Geologist and the County a report which shall contain <br /> all the information as required by Section 2207 of the Public Resources Code. The cost of the <br /> inspection shall be paid by the mine operator. Additional inspections may be conducted,but the cost <br /> of additional inspections shall be paid for by the mine operator only if non-compliance with the <br /> conditions of the Quarry Excavation Permit or the reclamation plan is found. (Development Title <br /> Section 9-1415.3[q]) <br /> s) PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance with <br /> conditions of approval, and compliance with County and state mining regulations,the applicant shall <br /> provide performance guarantees as a condition of the issuance of the Quarry Excavation Permit. The <br /> amount and form of the guarantee shall be subject to annual review and approval by the County and <br /> the state, and the amount shall be adequate to ensure reclamation of disturbed land and/or land to be <br /> disturbed during a given phase. The annual review of the financial guarantee shall be coordinated <br /> with the annual inspection and approval of successive reclamation security so that the_ guarantee <br /> includes the amount of disturbed land plus the amount of land estimated to be disturbed during the <br /> next 12 months, less the amount of land previously determined by Development Services Division <br /> annual inspection to have been reclaimed. The performance guarantee shall be in the form of either: <br /> 1)a surety bond,2)a trust fund with the lead agency,or 3)an irrevocable letter of credit. Any interest <br /> accrued in a trust fund shall stay with the trust fund account. The financial guarantee shall be payable <br /> to "San Joaquin County or the Department of Conservation' under the applicable provisions of the <br /> County and the state mining regulations. The financial guarantee shall be callable by the County or <br /> the State under the following circumstances: <br />
The URL can be used to link to this page
Your browser does not support the video tag.