My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004606 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
9501
>
2600 - Land Use Program
>
PA-0400450
>
SU0004606 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:57 AM
Creation date
9/6/2019 10:32:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004606
PE
2622
FACILITY_NAME
PA-0400450
STREET_NUMBER
9501
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
APN
00731011
ENTERED_DATE
8/13/2004 12:00:00 AM
SITE_LOCATION
9501 E JAHANT RD
RECEIVED_DATE
8/11/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JAHANT\9501\PA-0400450\SU0004606\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reference Point (RP) Reference Point (RP) <br /> ` Original Gmund (OG) Ongiaf Ground (OG) <br /> Drell 6" dia. hole <br /> V <br /> r <br /> a <br /> 1 <br /> 4 da. PUC pipe r <br /> ` Drill 4" dia- tole o <br /> 2" dia. PYC pipe <br /> Drill 1/4" holes in PVC pipe - o 0 o i <br /> - <br /> ' o00 �i r.r <br /> 0o <br /> 6. o Grovel size 1/4-to 3/8 0 0 a� v <br /> 0 0 0- <br /> 0 0 0 <br /> � a <br /> $ 2" Mm. Grovel <br /> Threaded or GI <br /> V Connection Joint SHALLOW HOLE (6-dia.) <br /> NTS <br /> Lift Hole 1 <br /> I <br /> I <br /> 1r <br /> I!. <br /> Drift 1/4" holes in PVC pipe <br /> a <br /> Gravel size 1/4-ID 3/8- I o <br /> 2" Min_ Gravel <br /> DEEP HOLE (4"dia.) <br /> NTS <br /> 1- Sleeve the hole with PVC pipr and gnml as soon as ! <br /> possible after drilling. <br /> V <br /> 2. Measure depth prior to releaseof trdler- Deep holes I <br /> holes must be cleaned out by the driller. Shallow <br /> holes (42' deep) can be cleaned out with 4' auger. <br /> 3. O.K. to place pore grovel on the exterior of the <br /> PVC Sleeve. than the minimum that is shown. <br /> 4. Use a funnel to pour rater into the PVC pipe- <br /> ENGINEER: Earnest F. Smith HOLE PREPARATION (Deep/Shallow) APN: <br /> I n b,ac;a-� PERCOLATION TESTS DATE: S —o <br />
The URL can be used to link to this page
Your browser does not support the video tag.