Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> I'A-05-481 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $1,346.00 per 1,000 gross square foot of building <br /> designated as Service Commercial in the Lodi area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site flan shall be submitted prior to release of building permit. <br /> 5. Verification shat l be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan 1~orrnat for Development Projects. Final Site flan is required upon <br /> subI-nittal of verification. <br /> Note: Any coilsti'uctloo activity that fesults in the disturbance of at least one (i) acre of soil shall require a State <br /> NI'DES const.ructian permit. <br /> MRC:SILar <br /> TS1S:UYl2 <br />