My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004551
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JUNCTION
>
2684
>
2600 - Land Use Program
>
PA-0400077
>
SU0004551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:53 AM
Creation date
9/6/2019 10:34:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004551
PE
2687
FACILITY_NAME
PA-0400077
STREET_NUMBER
2684
Direction
E
STREET_NAME
JUNCTION
STREET_TYPE
DR
City
MANTECA
ENTERED_DATE
7/13/2004 12:00:00 AM
SITE_LOCATION
2684 E JUNCTION DR
RECEIVED_DATE
3/23/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JUNCTION\2684\PA-0400077\SU0004551\APPL.PDF \MIGRATIONS\J\JUNCTION\2684\PA-0400077\SU0004551\CDD OK.PDF \MIGRATIONS\J\JUNCTION\2684\PA-0400077\SU0004551\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN�ALLEY UNIFIED AIR POLLUTION _._JNTROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Prior to any renovation or demolition of a facility <br /> Inspect:Conduct an asbestos Inspection of the site before: <br /> -Any renovation which 160 sq,ft.of building materials,or 260 linear feet of pipe insulation will be disturbed,or <br /> -Any demolition of a facility with or without asbestos-containing materials <br /> Notify,Submit an asbestos notification form for any regulated renovation or demolition, 10 working days before the activity. <br /> Ffta:Fees must be paid to the District with the notification for all regulated renovations and demolitions. <br /> Demolition Release Form:Prior to any demolition,you must have completed a demolition release form.Upon its approval by the <br /> District this signed form may be used as proof(needed by the building official)of compliance with,or exemption from,the <br /> NESHAP notification requirements. <br /> Submit this form to the building department with your application for a demolition permit. <br /> Applicability <br /> Facilities subject to the NESHAP(regulated facilities)include all commercial buildings,apartments with more than 4 units,other <br /> structures and non-portable equipment Single family dwellings may be exempt,but only on a case by case basis. <br /> Demolitions subject to the NESHAP(regulated demolitions)are demolitions of facilities described above,whether or not asbestos <br /> is present. <br /> Reoulated renovation applies to any activity in which 160 sq.ft.of regulated asbestos-containing building materials or 260 linear <br /> feet of asbestos-containing pipe insulation is disturbed at a regulated facility. <br /> Definitions <br /> Facilities: Facilities subject to the rule Include "all structures, installations, buildings and <br /> equipment,except for single family dwellings and apartments with four or fewer dwelling <br /> units.' Single family dwellings and apartments are also subject to the regulation if: <br /> -There is more than one building at a site being renovated or demolished,or <br /> -The building had been used for,or is being removed for a commercial or public use,or <br /> is to be used as a training bum exercise. <br /> Demolition: In addition to the total destruction of a structure,demolitions include"the removal of any <br /> structural load-bearing member from a facility together with any related handling <br /> operations or the intentional burning of a building: (training bums conducted by a fire <br /> fighting agency). Also, the separation of a structure from its foundation prior to <br /> relocation is a demolition. <br /> Renovation: Altering a facility or one or more facility components in any way,including the stripping or <br /> removal of regulated asbestos-containing material (RACM) from a facility component. <br /> Renovations include all activities in which asbestos could be disturbed at a regulated <br /> facility,Including the clean up and removal of debris from buildings which have burned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.