My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0001152 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23623
>
2600 - Land Use Program
>
MS-92-02
>
SU0001152 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:28:27 AM
Creation date
9/6/2019 10:34:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0001152
PE
2622
FACILITY_NAME
MS-92-02
STREET_NUMBER
23623
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
ENTERED_DATE
10/10/2001 12:00:00 AM
SITE_LOCATION
23623 S KASSON RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KASSON\23623\MS-92-02\SU0001152\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPTH OF WATER TABLE : <br /> AVERAGE NATURAL GROUND ELEVATION = 30 <br /> AVERAGE WATER TABLE ELEVATION = 10 <br /> DEPTH TO WATER TABLE = 20 <br /> F <br /> HISTORY OF PAST USES IN PROJECT AREA: <br /> THE PAST AND CURRENT USE OF THE PROJECT SITE AND THE AREAS SURROUNDING <br /> IT IS AGRICULTURAL . <br /> INTENSITY AND EXTENT OF PROPOSED DEVELOPMENT : <br /> THE OWNER IS SUBDIVIDING APPROXIMATELY 254 . 4 ACRES INTO 6 PARCELS . <br /> EACH PARCEL IS APPROXIMATELY 40 ACRES OF ROW CROPS . PARCEL 1 ALREADY <br /> HAS A HOME AND SOME ACCESORY BUILDINGS . THE EXTENT OF THIS PROJECT IS <br /> TO BUILD A HOMESITE ON EACH OF THE REMAINING PARCELS . <br /> ENGINEER ' S OPINION OF SOIL SUITABILITY : <br /> A PERCOLATION TEST WAS PERFORMED ON ALL OF THE PARCELS . THE TESTS FOR <br /> PARCELS 1 , 2 AND 6 DID NOT PASS THE MINIMUM REQUIRED PERCOLATION RATE <br /> AND WERE RETESTED AT THE LOCATIONS SHOWN ON MAP ( SHEET 9 ) . A POSSIBLE <br /> EXPLANATION FOR THE ABOVE-MENTIONED TESTS FAILING IS THAT THE GROUND IN <br /> THE AREA IN WHICH THESE TESTS WERE PERFORMED COULD OF BEEN COMPACTED BY <br /> THE OPERATION OF HEAVEY EQUIPMENT AT THE TIME THE HIGHWAY WAS <br /> CONSTRUCTED. THE RETEST OF PARCEL 6 ONLY PERCOLATED 1 /4 INCH IN THE <br /> LAST HALF HOUR OR 120 MINUTES PER INCH . PRIOR TO THAT IT PERCOLATED <br /> 1-1 /2 INCHES, 1-1 /2 INCHES AND 1 INCH FOR THE THREE HALF HOUR PERIODS <br /> PRECEEDING THE LAST HALF HOUR . THE PERSON PERFORMING THE TEST SHOULD <br /> HAVE REFILLED THE WATER , SINCE 4 INCHES HAD PERCOLATED AND THERE WAS <br /> LITTLE WATER LEFT IN THE HOLE FOR THE LAST HALF HOUR . ON THIS BASIS WE <br /> ARE ACCEPTING THE RATE FROM THE HALF HOUR JUST PRIOR TO THE LAST HALF <br /> HOUR . <br /> FROM THE INFORMATION CONTAINED HEREIN , WE FIND THAT THE SOIL AT THIS <br /> PROJECT SITE IS SUITABLE FOR THE EXISTING AND PROPOSED DOMESTIC SEPTIC <br /> SYSTEMS AND THAT THE USE OF THESE SYSTEMS WILL NOT ADVERSELY AFFECT THE <br /> QUALITY OF THE GROUND WATER . <br /> k M.-'�_ QROFEss/ <br /> #0 NNCE <br /> r - <br /> 2 rrlZ <br /> b4' 7� ; ,3 NO. 14,269 <br /> � EXe,3-31-43 <br /> J,]glF C/V 1\' <br /> OF c <br /> SHEET 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.