Laserfiche WebLink
ti <br /> Rick Griffin <br /> Community Development <br /> PA-0900059 <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 3. An Irrevocable Offer and Agreement to Dedicate Road to result in a 25 foot wide right-of-way from the <br /> centerline of MacChesney Avenue to the property line shall be required across the frontage of APN's 239- <br /> 230-03 &04. The Irrevocable Offer of Dedication shall be made on the Parcel Map. (Development Title <br /> Section 9-1150.5) <br /> 4. An Irrevocable Offer and Agreement to Dedicate Road to result in a 42 foot wide right-of-way from the <br /> centerline of Kasson Road to the property line shall be required across the frontage of APN 239-230-03. <br /> The Irrevocable Offer of Dedication shall be made on the Parcel Map. (Development Title Section 9- <br /> 1150.5) <br /> Informational Notes: <br /> (i.) Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a State <br /> NPDES construction permit. Dischargers whose projects disturb 1 or more acres of soil or whose projects <br /> disturb less than 1 acres, are required to obtain coverage under the General Permit for Discharges of <br /> Storm Water Associated with Construction Activity(Construction General Permit, 99-08DWQ) <br /> (www.swrcb.ca.gov/stormwtr/gen—const.html#const_permit). Construction activity subject to this permit <br /> includes clearing, grading and disturbances to the ground such as stockpiling, or excavation, but does not <br /> include regular maintenance activities performed to restore the original line, grade, or capacity of the <br /> facility. <br /> (ii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements (Title 9, Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23) that are in force at the time of permit <br /> issuance. As an example, these requirements may include raising the finish floor elevation one foot above <br /> the expected flood level and/or using flood resistant materials. <br /> BD:DS <br /> I\Sipwgov.orglsharesiDevServices\DPubServICOMMENTSIMSIYR 20091PA-0900059 APP.doc <br />