Laserfiche WebLink
M �� CONDOR EARTH TECHNOLOGIES INC <br /> 188 Frank West Circle, Suite I <br /> Stockton, CA 95206 <br /> MAY 2 7 2008 CEIIVkD Phone 209.234.0518 <br /> FAX 209.234.0538 <br /> CONDOR ENVIRONMENT HEALTH www.condorearth.com <br /> ' HEA HOMES qfxtv,April 25, 2008 <br /> LMr. David Sargent S'S�q y�MFS <br /> Shea Homes Mountain House,LLC HFj� <br /> L 2580 Shea Center Drive HOr�Es <br /> Livermore, CA 94550 <br /> Re: Phase I Environmental Site Assessment Update Report for Neighborhood I and <br /> Neighborhood J,Mountain House,California <br /> Condor Project No.4601M2 <br /> LDear Mr. Sargent: <br /> Thitisa eport o findings for the Phase I Environmental Site Assessment (ESA) update for <br /> L Neids I wit Assessor's Parcel Numbers(APNs 209-030 02, -11, -12, -18, and 209-020-23 and- <br /> 24) s 209 030-04 and 209-040-02), and portions of APNs 209-030-03, -05, and -23 in both <br /> NeiJ (Site) (Figures 1 through 3, Attachment A). Condor Earth Technologies, hic. <br /> (Condor) is submitting this report in order to update the Neighborhood I & Neighborhood J Phase I <br /> L Environmental Site Assessment Report and a Partial Response to Mountain House Master Plan Chapter <br /> Six, Mountain House, San Joaquin County, California, both dated September 17, 2004 and both prepared <br /> i by Condor. The Phase I ESA was performed in accordance with the guidelines set forth in Practice E <br /> L 1527-00, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment <br /> Process, published in May 1993 (Revised 2000) by the American Society for Testing and Materials <br /> (ASTM) and in accordance with the prevailing standard of care for completing such assessments in <br /> LCalifornia at the time of the site visits. This update report was conducted in accordance with the <br /> guidelines set forth in ASTM Practice E 1527-05, published November, 2005, which is the most recent <br /> Phase I ESA Standard published by ASTM. This report includes a summary of the Phase I ESA <br /> Lconclusions and a description of changes in both environmental database searches and to Site conditions. <br /> SUMMARY OF PHASE I ESA <br /> LNeighborhoods I & J (Site) comprise of approxima 428 328 a es, both under development for <br /> residential purposes. Condor determined the follovn zed ronmental conditions associated <br /> with the Site: <br /> • The historical application of agricultural chemicals for agricultural purposes on both <br /> LXbijft9rhood I and Neighborhood J. Reconnaissance soil sampling and laboratory analyses in <br /> both Neikhborhoods indicated no detectable pestici a or herbicides. <br /> • Oil stainin on the northwestern comer of barn #4 and the surrounding soil and the soil staining <br /> L uth of th pump house(APN 209-030-03)-Neighborhood L _ <br /> • The nce of an approx <br /> dtrdre -containing AST and the esence of 7 <br /> containing drums on APN 209- 0-18 and the pr ence of an approximat 500-gallon dies - <br /> containing AST on APN 209-03 -0 ood L <br /> L <br /> L <br />