Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN II <br /> SPII Implementation Measures <br /> 1. MHCSC Mosquito Abatement Requirements. All drainage basins,corridors <br /> and other potential standing water areas shall be designed to comply with <br /> the requirements of Master Flan Appendix 6-A a more current standards <br /> required by the MHCSD in coordination with the San Joaquin Caunty <br /> Mosquito Abatoment 171strlct. <br /> 6.12 PHASING AND COSTS <br /> Master Plan Summary <br /> Poloe and Fate <br /> A temporary{ire Facility will be provided prior to the construction of permanent facilities. II: <br /> Is anticipated that the first fire slation will be bulli when there are approxlmareiy 1,8W <br /> homes iR the community and will be expanded when there are 4.200 homes and three <br /> neighborhoods developed. The first phase of the second station will be needed when <br /> there are approximately 8,400 homes in Mountain Hquse;the facility will be expanded <br /> when 12,000 units have leen built. <br /> It Is anticipated that the decision regarding whether to establish an on-site police <br /> substation will be Blade by the police services provider and the MHC-SO when the <br /> community's population reaches approximately 7,500.The final decision will rest with the <br /> SheriTs department based on the department's success in meeting urban levels of service <br /> without an on-site station,consistent with any contract for police service and consistent <br /> with standards for service in comparable mmmflnitles within Ban Joaquin County and the <br /> General Plan, <br /> Fire protection and police vehiates will be purchased on an as-needed basis throughout <br /> development ut the community, starting in the fist few years. Cast estimates assume that <br /> sites for fire stations and the police substatiorf will be dedicated. A detailed facility cost <br /> and phasing plan is provided in the Public Financing Plan(PF P). <br /> AiTimef Gur&ol <br /> Initially.animal control will be provided by the County on a contract Weis, and current <br /> County facilities will be used. However,as the community grows, an on-site animal control <br /> facility may be repilired; a$300.000 facility is expected to be built when approximately <br /> twa-thirds of the Maxtor Plan;and uses have been developed. The community will be <br /> expected to provide or pay the Cost of any n�ded f3dRies. <br /> Plan Description <br /> The Master Plan requilromenis related to phasing and costs will he implemented by SPIT <br /> through the implementation measures listed below_ <br /> SPIT Implementation Measures <br /> 1. Phasinn and Costs. All implementing projects shall corn ply With the <br /> applicable requirements of the Public Financing Plan and Technical Report, <br /> Master Acquisition and Rol mbursemant Agreement between the MHCSD and <br /> Trimark Comm unitles,Master Plan DevelopmentAgmement between San <br /> f Joaquin Counfy and TrinimkOurniFRw ties;kL�the Maxtor Developer, <br /> MHC SL Capital Impravement Program,and appiicable dove lopment fee <br /> Ordinances. <br /> CHAPTER SIX P ueUG HEALT"AND SAF PTY PAG t;6,14 <br /> Resolution Template 01/2017 <br />