Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN II <br /> approvals,the specific triggers contained within the Master Plan will ba super-ceded by <br /> subsequent MHCSD phasing and trigger determinations. <br /> SPU Implementation Measures <br /> 1. Community Roadway Improvements Phasing Reg Li rements. The apeelllc <br /> Improvement phasing requirements contained within Master Plan Tables 9.1. <br /> 9.2,and 9.8 are specifically s*+percp le Iuperseded by the requirements and <br /> proyisiona contained within Specific PJ an II,the improvements descrlbed In <br /> Tahlas 5A5-2i], 5-16.21 and S.15.22 W the Specific Nan II Expanded Inldal <br /> Study,the MHC SO Roadway Improvement Plan,the MHCSD Mountain House <br /> Transportation Improvement Fee Ordinance and Technical Report Dated <br /> March 19,ZOflD,the applicable provisions of the Master Acqulsition and <br /> Reim bursamn nt Agreem ant between the MHCSD and Tr4mark ► unttim <br /> L-L-Gthe Master Devetoeer,and Section 3.6.12 of the Master Plan <br /> Development Agreement between San Joaquin County and Trimark <br /> Gnmint4rrlT1e&r LLC1he Master Developer. The timing anti extent of all project <br /> specific pleased improvements of community roadways shall be determined <br /> as part of MHCSD Traffic Studies for all implementing projects. <br /> 2. _County Funding and_Particioation Reg u irements. All implementing projects <br /> shall Comply with the requirements of the San Joaquin County Traffic Impact <br /> Mitigation Fee Ordinance,and Section 3,6.12 of the Master Plan Development <br /> Agreement between San Joaquin County and Tr n ark Comrs cm4le&,LLGthe <br /> Master Developer, <br /> 3. MHGS EVCounty Miti pation Off-Set Program, At implementing projects shall <br /> comply with the requirements of the MHCSDICounty Mitigation Offset <br /> Program contained within the MHCSD Mountain Hous4 Transportation <br /> Improvement Foe Ordinance and Technical Report Dated March 19,20DD and <br /> Section 3.6.12 of the Master Plan Development Agreement between San <br /> Joaquin County and T-Wnafk GO mumti es,(�Cthe Master Dovetepet. <br /> d. Community Participation. Subject to the provisions contained within Section <br /> 3.6.12 of the Master Plan Development Agreement between San Joaquin <br /> County and Trirwwk G m m--RWes ' I the Master Developer,if warranted by <br /> the traffic monitoring program,or,if initiated by others,dmaiepmant within <br /> Specific Plan li shall participate to the extent of its fair share In the traffic <br /> studies and Improvementmeasures for fmpravements not listed in Ta We 9.2, <br /> including the foilowing: Eleventh Street,Byron Road(south of Grant Line <br /> Road),existing Grant Une Road(east of Byron Road), new Grant rine Road <br /> {realigned sec#ion east of Byron toad},grade separation at Grant Lino Road <br /> crossing the Southern Pacific tallroad tracks(City of Tracy),Middle Road <br /> extension(from Gold Rush City to MountaIn House),(Cities of Lathrop and <br /> Tracy),Altamont Pass load(Alameda County).Byron Highway(Contra <br /> Costa County). <br /> 5. O peration and Safety Im provematits. Subject to the provisions contained <br /> within Section 3.6.12 of the Master Plan Development Agreement between <br /> San Joaquin County and LL the Master Developer, <br /> development within SpWflc Plan II shall,to the extent of its fair share, <br /> participate in upgrading <br /> CHAPTER MINE TRANSPORTA110N AND CIRCULATION PAGE 5.4 <br /> Resolution Template 01/2017 <br />