My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012410
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KELSO
>
15653
>
2600 - Land Use Program
>
PA-0600327
>
SU0012410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:51:43 PM
Creation date
9/6/2019 10:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012410
PE
2611
FACILITY_NAME
PA-0600327
STREET_NUMBER
15653
Direction
S
STREET_NAME
KELSO
STREET_TYPE
RD
City
TRACY
Zip
95391-
APN
25802035
ENTERED_DATE
7/10/2019 12:00:00 AM
SITE_LOCATION
15653 S KELSO RD
RECEIVED_DATE
7/19/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\K\KELSO\15653\PA-0600327\SU0012410\APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN II <br /> 9.11 PHASING AND COSTS <br /> Master Plan Summary <br /> Development of in-traet roads will be the rssponsibflity of individual builders. A 3514 to <br /> 50%markup is inGuded where appropriate to cover engineering,design, pfan check, <br /> inspection,and other soft costs. <br /> Pleasing of tronsportadon improvements will generally relate to the phasing of residential <br /> and non-residential land uses. The traffic monitoring program wall result in annual updates <br /> to the Roadway Improvement Plan hinh will initially be prepared after approval of the <br /> Master Plan, Improvements will be developed on an as-needed basis to maintain the LDS <br /> standards identified In this chaplar, <br /> The Implementation procedures discussed in Master Plan Sections 9.2: Freeway <br /> Improvements,to 9-5i On-Sita Roadway Circulation and Design,include anticipated start- <br /> up events for construction of freeway and Arterial improvements. On-sile roadways will be <br /> phased consistent with the amount and IucatJon of development. Phasing of County roads <br /> will be controlled by the County and coordinated with the community's Roadway <br /> I Impto vemeht Plan. <br /> Rus transit and bicycle facilities will be provided incrementally throughout bulldout of the <br /> community,with transit stops,shekters,bicycle lockers and racks in each neighborhood. <br /> The Mocor;o rail platform will be built after passenger service is initiated_ <br /> Railroad crossings and intersection channalization improvements will be constructed in <br /> response to traffic volume and circulation pattems in order to maintain the required level of <br /> service. <br /> Plan description <br /> WI irnprovements will be financed with private funding in exchange for fee credits <br /> imposed through the MHCSD's MHTIF. In addition,some oft-site(in-community) <br /> improvements will likely be required in order to maintain County starfdafds for levels of <br /> service. All such improvements will be further defined and required by the MHC,90 as part <br /> of Both the Traffic Irrlpaat Analysis prepared by the MI-ICSI7's traffic consultant, and <br /> subsequent detailed engineering. <br /> The implementation of SP 11 will generate,through the collection of local and regldn2ii <br /> traffic impact fees,funds to he collected by the County(TI MFy and MHCSD(MHTIF)to <br /> pay for future roadway and transpoflation program responsibilities of the pr❑)ect, <br /> consistent with the community approvals and pollcies contained in Section 9 of the Master <br /> Plan and Specific Plan I,as implemented by ordinance. Development of the various tend <br /> uses will also generate tax avenue forte Mi-ICSID that will fund specific transit services <br /> and programs adentifled by the MHCSR's T❑M program. <br /> SPII Implementation Measures <br /> t Community Roadway Improvements Phasinq Requirements. The specific <br /> Improvement phasing requirements Ctintained within Master Specific Plan <br /> Tables 9.1,9.2,and 9.8 are specifically su ^,wide superseded by the <br /> requirements and provisions contained within Speclfle Plan K the <br /> improvements described in Tables 5.15-20,5.16-21 and 5.15.22 Df the <br /> Specific Plan II Expanded InitlaI Study,the MHCSD Roadway Improvement <br /> Plan,the MH CSD Mountain House Transportation Improvernent Fee <br /> Ordinance and Technical Report Dated March 19, 2000,and Section 3.612 of <br /> i~HAPTP;R NINI= TRANSPORTATION AND CIRcuLATION PAGE9,22 <br /> Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.