Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN 11 <br /> Water Treatment plant are in compliance wit# the des Ian and operational <br /> req uleements of the State. <br /> 1112 CAPITAL FACILITY COST AND PHASING <br /> mastar Plan Summary <br /> The Master Plan assumes that the water treatment plant will be pfiased in components <br /> equal to 25%of the total faeiI4,with one c omponernt in place at the start of eaail phase of <br /> davMopment. <br /> The first component was In place as of 2002.Storage tanks are assumed to Lae phased in <br /> three increments after the first Specific Plan. Storage ponds, pumps,and othir Items will <br /> be provided in smaller increments_ <br /> Plan Description <br /> As part pf the implementation of SPI 1.phased construction of the water treatment plant wHl <br /> be administered by the MPGSU to ensure that adequate facilities are in place with each <br /> incsementai phase of development. <br /> SPIT Implementation Measures <br /> 1. Cost and Phasing Requirements. Aft implementing projects shall comply <br /> wFth the applicable requirements of the Public Financing Plan and Fechnicaf <br /> Repgrt,Masher Acquisition and Rei mbursernent Agreement betwean tm <br /> MHCSD and Trimark Com rrmunities,MasterPlan Development Agreement <br /> between San Joaquin Cpuhty and TfimaPk C$rur"aWLAs,UCthe Master <br /> Deve_louer,MHCSD Capital Improvement Program,and applicable <br /> development fee Ordinances. <br /> CKA P TE R TWE LVI= POTA13LE WATER PA{E i 7,.15 <br /> Resolution Template 01/2017 <br />