My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012410
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KELSO
>
15653
>
2600 - Land Use Program
>
PA-0600327
>
SU0012410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:51:43 PM
Creation date
9/6/2019 10:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012410
PE
2611
FACILITY_NAME
PA-0600327
STREET_NUMBER
15653
Direction
S
STREET_NAME
KELSO
STREET_TYPE
RD
City
TRACY
Zip
95391-
APN
25802035
ENTERED_DATE
7/10/2019 12:00:00 AM
SITE_LOCATION
15653 S KELSO RD
RECEIVED_DATE
7/19/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\K\KELSO\15653\PA-0600327\SU0012410\APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN li <br /> 13.7 CAPITAL FACILITY COST ANO PHASING <br /> Master flan Summary <br /> The Master PWn required that initial aerated lagoons and pumps Fye sized to satisfy the <br /> dernands of the first neighb❑rho❑d_ They will be replaced with a higher volume treatmenL <br /> facility upan cornmenuement of the seccnd Specific Flan,and will be expandable to <br /> accommodate future development phases. All line sizing will be engineered to handle <br /> through flows from suceessive neighborhoods in a mordianoe with the Master Plan_ Cost <br /> and phasing assumptions are discussed in more detail in the Public Hnancing Plan(PFI'). <br /> Plan Description <br /> SPII will be developed in accordance with all Com munky Approvals which govern the <br /> provision,operation,and financing of at;wastewater collection,conveyance,treatment and <br /> disposal systems_ The inancing and construction mechanisms for all such facilities have <br /> alreedy been cmated and are currently being implemented by the MHC8❑as part of <br /> devalopmnt of the Mountain House Community. SPH will also be subject to these sable <br /> requirements and mechanisms, <br /> SPII Implementation Measures <br /> 1. Costs and Phasing. All Implarnenting projects shall cflmp$y with the <br /> applicable req ui+ements of the Public Financing Plan and Tech nicaI Report, <br /> Master Acquisition and Reimbursement Agrsemernt between tie MHCSf7 and <br /> Trimark Communptles,Master Ptan Development Agmemont hetween San <br /> Joaquin County and Triwa6r-CoruinuMUM LLGthe Master Developer, <br /> MHC SD Capital Improvement Program,and applicable development fee <br /> Ordlaances. <br /> CHAPTER THIRTEEN W"TWATER COLLECTI3N AND TREATMENT PAGE t l 1 <br /> Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.