Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN li <br /> 13.7 CAPITAL FACILITY COST ANO PHASING <br /> Master flan Summary <br /> The Master PWn required that initial aerated lagoons and pumps Fye sized to satisfy the <br /> dernands of the first neighb❑rho❑d_ They will be replaced with a higher volume treatmenL <br /> facility upan cornmenuement of the seccnd Specific Flan,and will be expandable to <br /> accommodate future development phases. All line sizing will be engineered to handle <br /> through flows from suceessive neighborhoods in a mordianoe with the Master Plan_ Cost <br /> and phasing assumptions are discussed in more detail in the Public Hnancing Plan(PFI'). <br /> Plan Description <br /> SPII will be developed in accordance with all Com munky Approvals which govern the <br /> provision,operation,and financing of at;wastewater collection,conveyance,treatment and <br /> disposal systems_ The inancing and construction mechanisms for all such facilities have <br /> alreedy been cmated and are currently being implemented by the MHC8❑as part of <br /> devalopmnt of the Mountain House Community. SPH will also be subject to these sable <br /> requirements and mechanisms, <br /> SPII Implementation Measures <br /> 1. Costs and Phasing. All Implarnenting projects shall cflmp$y with the <br /> applicable req ui+ements of the Public Financing Plan and Tech nicaI Report, <br /> Master Acquisition and Reimbursement Agrsemernt between tie MHCSf7 and <br /> Trimark Communptles,Master Ptan Development Agmemont hetween San <br /> Joaquin County and Triwa6r-CoruinuMUM LLGthe Master Developer, <br /> MHC SD Capital Improvement Program,and applicable development fee <br /> Ordlaances. <br /> CHAPTER THIRTEEN W"TWATER COLLECTI3N AND TREATMENT PAGE t l 1 <br /> Resolution Template 01/2017 <br />