My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012410
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KELSO
>
15653
>
2600 - Land Use Program
>
PA-0600327
>
SU0012410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:51:43 PM
Creation date
9/6/2019 10:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012410
PE
2611
FACILITY_NAME
PA-0600327
STREET_NUMBER
15653
Direction
S
STREET_NAME
KELSO
STREET_TYPE
RD
City
TRACY
Zip
95391-
APN
25802035
ENTERED_DATE
7/10/2019 12:00:00 AM
SITE_LOCATION
15653 S KELSO RD
RECEIVED_DATE
7/19/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\K\KELSO\15653\PA-0600327\SU0012410\APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to approval of <br /> Final Maps. [SPIT Implementation Measure 6.8.3 (1)] <br /> 28. Geotechnical Investigation Recommendations: The applicant shall follow the recommendations of <br /> the following geotechnical investigations: <br /> a.. Geotechnical Engineering Study, Neighborhood 1, Mountain House, California, prepared in April of <br /> 2004 by Condor Earth Technologies; <br /> b. Geotechnical Engineering Study, Neighborhood J, Mountain House, California, prepared in April of <br /> 2004 by Condor Earth Technologies; <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to approval of <br /> Final Maps, and the incorporation of all recommendations of the geotechnical engineering studies into <br /> site preparation and construction of each dwelling prior to approval of building permits. [SP II <br /> Implementation Measure 6.8.3 (2); San Joaquin County Development Title, Chapter 9-905] <br /> MINERAL RIGHTS <br /> 29. Surface Entry Rights: The subdivider shall provide a surface entry site located east of Central <br /> Parkway and south of the intersection of Central Parkway and Mountain House Parkway within the <br /> Community Park of Neighborhood L, or an alternate surface entry site that is consistent with Specific <br /> Plan II requirements and acceptable to the CDD and MHCSD, to assure third party entry rights to <br /> access minerals. [Specific Plan II, Section 3.3.5, Implementation Measure (1)] <br /> Timing: Condition shall be met prior to approval of the first Final Map in Neighborhood L. <br /> HAZARDS <br /> 30. Hazardous Materials-AST: The applicant shall remove the above-ground storage tanks (ASTs) <br /> observed in Neighborhood I prior to site development. All diesel-containing ASTs shall be abandoned <br /> in accordance with local and State requirements. Upon removal of the ASTs, soil samples shall be <br /> collected from beneath the ASTs to ensure that these soils are clean in accordance with the <br /> recommendations of Neighborhood I Phase I Environmental Site Assessment Report. If it is <br /> determined that soils beneath the tank(s) are contaminated, all potentially contaminated shall be <br /> contained. Containment shall be accomplished by excavating a relatively small area at the location of <br /> the AST. The soil shall be properly disposed of in accordance with the requirements of the County <br /> Environmental Health Department and the applicable State agency. <br /> Timing: Corrective actions taken prior to the recordation of a Final Map.[SPII Implementation Measure <br /> 6.8.4 (2)] <br /> 31. Hazardous Materials—Contaminated Soil:. The stained soil in the graveled area south of one of <br /> the well houses and at the northwest corner of the westernmost barn in Neighborhood I (APN 209- <br /> 030-03) shall be tested prior to the issuance of grading permits to ensure that soil or groundwater has <br /> not been contaminated by petroleum products. Additionally, soil testing shall be conducted beneath <br /> the debris and solid waste piles on the eastern portion of APN 209-030-23, in the eastern portion of <br /> APN 209-030-12, and on APN 209-030. If it is determined that these soils are contaminated, all <br /> potentially contaminated soil shall be contained. The soil shall be properly disposed of in accordance <br /> with the requirements of the County Environmental Health Department and the applicable State <br /> agency. <br /> Timing: Corrective actions taken prior to the recordation of a Final Map. [SPIT Implementation <br /> Measure 6.8.4 (2)] <br /> 32. Hazardous Materials-Existing Structures: The applicant shall test all existing structures for lead- <br /> based paint and asbestos-containing building materials. If it is found that painted surfaces contain <br /> lead-based paint and/or the structures contain asbestos materials, the applicant shall prepare a <br /> Demolition Plan for the safe demolition of all site structures. The Demolition Plan shall address both <br /> on- and off-site chemical and physical hazards. Prior to demolition, the applicant shall remove all <br /> hazardous building materials such as peeling, chipping, and friable lead-based paint and asbestos <br /> containing building materials, such as peeling, chipping, and friable lead-based paint and asbestos- <br /> Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.