Laserfiche WebLink
the project shall be in place and fully operational. The MHCSD General Manager may defer the <br /> installation of a facility if it can be demonstrated to the satisfaction of the MHCSD General <br /> Manager that it is not required. Any deferral will require the developer to provide the MHCSD a <br /> bond insuring the eventual construction of the facility. <br /> 6. All conditions on the "Will Serve" letter from the Mountain House Community Services District <br /> shall be met prior to approval of Final Map. The MHCSD General Manager may defer the <br /> installation of a facility if bonding is provided or it can be demonstrated to the satisfaction of the <br /> MHCSD General Manager that it is not required. <br /> 7. All reference to approvals herein by the MHCSD shall be interpreted as approval by the General <br /> Manager or his designee except for those approvals specifically delegated by law to the Board of <br /> Directors. <br /> 8. All references to bonding shall mean a bond or any other security acceptable to MHCSD. <br /> 9. All conditions of approval and all applicable impacts and mitigation measures identified in the SP <br /> II plan and SP II EIR are to be met prior to filing of any of the project's Final Maps unless <br /> specifically noted under a condition and shall be in compliance with the MHCSD standards and <br /> specifications and as directed by the MHCSD General Manager. The MHCSD General Manager <br /> may defer a condition if bonding is provided and it can be demonstrated to the satisfaction of the <br /> MHCSD General Manager that it is not required. <br /> 10. Public lands shown on the tentative map shall be dedicated or offered for dedication to MHCSD <br /> at the time of approval of the Final Map in accordance with the PLEP Ordinance, if applicable. <br /> 11. All street cross sections shall meet all applicable State Fire Code requirements as determined by <br /> the MHCSD general Manager. <br /> 12. Groundwater rights shall be dedicated to the MHCSD upon approval of Final Maps. <br /> 13. Whenever all or any portion of a local or arterial street is constructed, the improvements shall <br /> include the installation of all streetlights. The Neighborhood lighting shall be provided as required <br /> by the MHCSD Design Manual unless otherwise approved by the General Manager. A <br /> Photometric layout of the lighting along with calculations showing conformance to MHCSD <br /> Standards shall be required. Street lights shall conform to the MHCSD Technical Specifications <br /> and Standard Details. <br /> 14. Restricted access shall be shown on the Final Map and shall be in accordance with the Master <br /> Plan, the Design Manual, and the MHCSD's Specifications and as directed by the General <br /> Manager. <br /> 15. Record Drawings shall be provided prior to acceptance of the improvements by the MHCSD. <br /> Record Drawings shall also be provided in digital format consistent with MHCSD File Format. <br /> 16. If project points of entry are gated: <br /> a. The gate location and design must be reviewed and approved by the MHCSD prior to <br /> filing of final map. <br /> b. Prior to issuance of first building permit, the developer must make improvements as <br /> recommended by the traffic Engineer. <br /> 17. Monitoring Agreement: The developer shall fund the Community Monitoring and Mitigation <br /> Monitoring Programs including the annual Traffic Monitoring Report. The developer shall also <br /> fund the MHCSD's efforts to monitor compliance with the Tentative Map conditions of approval. <br /> Timing: Ongoing. <br /> 18. Final Map Digital File: A digital file of the Final Map shall be submitted to the MHCSD and to the <br /> Community Development Department. The digital file format shall be consistent with <br /> Resolution Template 01/2017 <br />