Laserfiche WebLink
does not allow the improvements, the improvement funds shall be deposited with the <br /> MHCSD to be used as directed by the General Manager as described in the TIF program. <br /> i. Subject to the requirements of the Mountain House Transportation Improvement Fee <br /> Technical Report adopted by the MHCSD Board of Directors on April 11, 2000, and all <br /> amendments thereof to date, widen or fund, as determined by the MHCSD, Grant Line <br /> Road to four lanes from Great Valley Parkway to 1-580 freeway prior to issuance of the <br /> 2250th building permit beyond E, F and G. The developer shall improve and widen Grant <br /> Line Road between the Alameda County line and its intersection with I-580. If Alameda <br /> County does not allow the improvements to Grant Line Road, the developer shall deposit <br /> with the MHCSD funds equivalent to the cost of the widening as listed in the TIF Report. <br /> The MHCSD General Manager may use the funds to improve other regional roads as <br /> determined by a traffic study and stated in the TIF Technical Report and approved by the <br /> General Manager. If Grant Line Road in Alameda County is not widened, an interim <br /> design showing the transition from 4 lanes to two lanes within the boundary of Mountain <br /> House shall be submitted to the MHCSD for review and approval. <br /> j. Fund, as determined by the MHCSD, Grant Line Road to four lanes from Great Valley <br /> Parkway to 1-580 freeway prior to issuance of the 2250th building permit beyond E, F and <br /> G. The developer shall fund the improvement and widening of Grant Line Road between <br /> the Alameda County line and its intersection with I-580. If Alameda County does not <br /> allow the improvements to Grant Line Road, the developer shall deposit with the MHCSD <br /> funds equivalent to the cost of the widening as listed in the TIF Report. The MHCSD <br /> General Manager may use the funds to improve other regional roads as determined by a <br /> traffic study and stated in the TIF Technical Report and approved by the General <br /> Manager. If Grant Line Road in Alameda County is not widened, an interim design <br /> showing the transition from four lanes to two lanes within the boundaries of Mountain <br /> House shall be submitted to the MHCSD for review and approval. <br /> k. Prior to the issuance of the first residential building permit north of Byron Road one of the <br /> three permanent Byron Road crossings shall be constructed. Prior to the issuance of the <br /> 1300th residential building permit north of Byron Road, the second permanent Byron <br /> Road crossing shall be constructed. Prior to the 2700th residential building permit north <br /> of Byron Road, the third permanent Byron Road crossing shall be constructed. If, at any <br /> time, frequent regularly scheduled train service is established on the Union Pacific Line <br /> along Byron Road, no further Final Subdivision maps containing residential development <br /> will be approved until the Central Parkway flyover is constructed. <br /> I. Tentative maps with frontage on Great Valley Parkway shall install full frontage <br /> improvements. (The ultimate complete street section). <br /> m. Prior to the first final map, if the landscaping or any other portion of the 1-205 interchange <br /> improvement project has not been completed, the developer shall construct or pay the <br /> fair share of the remaining improvements based on the number of dwelling units in the <br /> project vs. the number of units in Mountain House. <br /> 34. Deferring Improvements: It is possible that the MHCSD may allow the deferring of street <br /> improvements (including utilities). If the developer wishes to pursue this option, then a formal <br /> written request shall be submitted to the MHCSD after the Tentative Map has been approved but <br /> before the approval of the Final Map. The request should define those street improvements that <br /> the developer wishes to defer. If the MHCSD should approve the deferment, it will be conditioned <br /> in the developer agreeing to construct the deferred improvements within a specified future time <br /> period and that a security, such as a bond, be provided the MHCSD guaranteeing the developer's <br /> performance. <br /> 35. If the property shown on the Tentative Map is to be developed in phases, then a subdivision <br /> agreement and appropriate bonding shall be executed between the MHCSD and the developer <br /> for each phase prior to the approval of the Final Map. <br /> Resolution Template 01/2017 <br />