Laserfiche WebLink
Conditions <br /> Use Permit Application No. PA-0700404 was approved by the Planning Commission on _. The <br /> effective date of approval is _. This approval will expire on _, which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been issued and remain in force, and (3) all necessary permits <br /> from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other ordinance <br /> requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Mo Hatef, [209]468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing winery to be completed in three <br /> phases as shown on the Site Plan dated November 30, 2007. Phase I (building permits to be issued <br /> within eighteen months from the effective date of approval) will include a 12,150 square foot cover <br /> over existing tanks and equipment. Phase It (building permits to be issued within five years from the <br /> effective date of approval) will include a new 8,000 square foot tasting room, administration, and <br /> storage building. The wine tasting room shall not exceed 4,170 square feet. Phase III (building <br /> permits to be issued within ten years from the effective date of approval) will include a 8,000 square <br /> foot case and barrel storage building. (Use Type:Winery and Wine Cellars,Winery, Large) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License prior to the <br /> initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> e. STORM DRAINAGE: Storm water drainage shall be retained on-site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> f. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> San Joaquin County PA-07004041Schatz <br /> Community Development Page 7 <br />