Laserfiche WebLink
f DEPARTMENT OF THE ARMY <br /> U.S.ARMY ENGINEER DISTRICT, SACRAMENTO <br /> CORPS OF ENGINEERS <br /> \� 1325 J STREET <br /> SACRAMENTO, CALIFORNIA 95814-2922 <br /> REPLY TO <br /> ATTENTION OF June 14,.2005 <br /> J N�CF/�O <br /> Regulatory Branch (200200322) 0e/77MU,ty p >• B ?ops <br /> eve�opmentDePt. <br /> Karla Kuhl <br /> San Joaquin County <br /> Community Development Department <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95205-6298 <br /> Dear Mr. Kuhl: <br /> I am responding to the Application Referral for Kettleman Lane Subdivision Parcel <br /> Split. Your identification number is PA-0200086 (TE). <br /> The Corps of Engineers' jurisdiction within the study area is under the authority of <br /> Section 404 of the Clean Water Act for the discharge of dredged or fill material into <br /> waters of the United States. Waters of the United States include, but are not limited to, <br /> rivers, perennial or intermittent streams, lakes, ponds, wetlands, vernal pools, marshes, <br /> wet meadows, and seeps. Project features that result in the discharge of dredged or fill <br /> material into waters of the United States will require Department of the Army <br /> authorization prior to starting work. <br /> To ascertain the extent of waters on the project site, the project proponent should <br /> prepare a wetland delineation, in accordance with the minimum standards for acceptance <br /> for wetland delineations posted on our website under "Jurisdiction" on our website at the <br /> address below, and submit it to this office for verification. <br /> The range of alternatives considered in this project should include alternatives that <br /> avoid impacts to wetlands or other waters of the United States. Every effort should be <br /> made to avoid project features which require the discharge of dredged or fill material into <br /> waters of the United States. In the event it can be clearly demonstrated there are no <br /> practicable alternatives to filling waters of the United States, mitigation plans should be <br /> developed to compensate for the unavoidable losses resulting from project implementation. <br />