Laserfiche WebLink
John Funderburg . -2- <br /> Conintunity Development Department <br /> PA-110OI29(SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the thne of building permit application for both phases of the project. The fee shall be <br /> automatically adjusted July I of each year by the Engineering Constnrctlon Cost index as <br /> published by the Engineering News Record.(Resolution R-00-433) <br /> 4, The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application for both phases of the project.The fee will be <br /> based on the current schedule at the time of payment. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development Inas <br /> rnet the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> 7. The developer shall expand existing on-site drainage facilities and meet the requirements of San <br /> Joaquin County Development Standards to prevent the increased nutoff release rate of storm water <br /> from discharging onto other properties and to prevent offsite sediment transport. The retention <br /> basin shall be fenced with six(6)foot high chaiat link fence or equal. Required retention basin <br /> capacity shall be calculated by a registered civil engineer, licensed contractor or licensed architect <br /> and submitted for review and approval along with a drainage plan, prior to release of building <br /> permit.(Development Title Section 9-1135) <br /> 8. The construction phase of Phase 1 and Phase 2 of the proposed project shall follow the practices in <br /> the County"Small Site Storm Water Management Plan". <br /> hiforinational Notes; <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito&Vector Control <br /> District(209-982-4675)and the California Health and Safety Code for the prevention of <br /> mosquitoes.Best Management Practices(BMP)guidelines for stormwater devices,ponds and <br /> wetlands are available. <br /> (ii.) All future building permits for projects located within a Special Flood 1-lazard Area at the time of <br /> permit issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9, <br /> Chapter 9-1605)and all requirements of the State of California(CCR Title 23)that are in force at <br /> the time of permit issuance. As an example,these requirements may include raising the finish <br /> floor elevation one foot above the expected flood level and/or using flood resistant materials. <br /> ACIDS <br /> ILSjpiigov-orgWyaresU)erSen,iced DPrrbServIC0,11,tIBiVTSISAIYR 1011IPA-1100129(Delia Pad-Arg Focilio-KetNeman Ler fiPA-1100129.doc <br />