Laserfiche WebLink
Table ES-1. Continued Page 9 of 10 <br /> Significance After <br /> Significance Mitigation <br /> Impact without Mitigation Mitigation Measure Incorporated <br /> Cumulative Impacts <br /> Impact CE-1: Cumulative Impact on Aesthetic Resources Less than No mitigation is required — <br /> Cumulatively <br /> Considerable <br /> Impact CE-2: Cumulative Displacement of Existing or Proposed Cumulatively No mitigation is available Cumulatively <br /> Land Uses Considerable Considerable <br /> Impact CE-3: Cumulative Conversion of Prime Agricultural Less than No mitigation is required — <br /> Lands Cumulatively <br /> Considerable <br /> Impact CE-4: Generation of Cumulatively Significant Levels of Cumulatively Mitigation Measure AIR-1: Prepare and Implement Cumulatively <br /> Pollutant Emissions Considerable a Dust Control Plan Considerable <br /> Mitigation Measure Ali Restrict Idling of Ori <br /> Road Diesel Trucks <br /> Mitigation Measure AIR-4b: Implement Emissions <br /> Control Technology <br /> Impact CE-5: Cumulative Loss of San Joaquin Kit Fox and Their Cumulatively No mitigation is available Cumulatively <br /> Habitat Considerable Considerable <br /> Impact CE-6: Cumulative Regional Groundwater Overdraft Less than Mitigation Measure GW-la: Monitor Groundwater Less than <br /> Cumulatively Quality; Implement Measures to Maintain Cumulatively <br /> Considerable Groundwater Levels as Necessary Considerable <br /> Mitigation Measure GW-lb: Maintain Well Offsets <br /> Mitigation Measure GW-3: Monitor and Report <br /> Groundwater Levels;Implement Measures to <br /> Maintain Groundwater Levels as Necessary <br /> Impact CE-7: Exposure of Noise-Sensitive Land Use to Cumulatively Mitigation Measure N-2: Employ Noise-Reducing Cumulatively <br /> Cumulative Noise Levels in Excess of County Standards Considerable Operational Practices Considerable <br /> Impact CE-8: Cumulative Change in Level of Service on SR 132 Cumulatively No mitigation is available Cumulatively <br /> between the I-580 and I-5 Interchanges Considerable Considerable <br /> Impact CE-9: Cumulative Change in Level of Service on SR 132 Cumulatively No mitigation is available Cumulatively <br /> East of the I-5 Interchange Considerable Considerable <br />