Laserfiche WebLink
San Joaquin County Community Introduction <br /> Development Department <br /> ■ Chapter 5,"Other CEQA Considerations,"discusses the cumulative and <br /> growth-inducing effects of the project, as well as other conclusions required <br /> by CEQA. <br /> ■ Chapter 6,"References Cited,"identifies the documents used(printed <br /> references)and individuals consulted(personal communications)during <br /> preparation of the draft EIR. <br /> ■ Chapter 7,"List of Report Preparers,"lists the individuals involved in <br /> preparing the EIR. <br /> r <br /> ■ Chapter 8,"Glossary,"defines technical terms used in the EIR. <br /> ■ Appendix A is a copy of the Notice of Preparation for this EIR. <br /> r <br /> ■ Appendix B contains the written comments received during the scoping <br /> process. <br /> r ■ Appendix C contains the quarry excavation application. <br /> ■ Appendix D contains the USFWS list of endangered,threatened,and <br /> proposed species for the project region. <br /> r <br /> ■ Appendix E is a copy of the Geotechnical Report prepared by Kleinfelder. <br /> ■ Appendix F is a copy of the DeSilva Gates Quarry Traffic and Circulation <br /> r Analysis prepared by Omni-Means. <br /> ■ Appendix G is the Cultural Resources Technical Study. <br /> r ■ Appendix H is background information on environmental acoustics. <br /> ■ Appendix I is the Groundwater Elevations memorandum prepared by <br /> Kleinfelder. <br /> r <br /> ■ Appendix J Air Quality Technical Information <br /> ■ Appendix K San Joaquin Valley Air Pollution Control District Regulation <br /> VIII—Fugitive PM 10 Prohibitions Dust Control Plan <br /> ■ Appendix L Diesel Engine Emission Control Technologies <br /> r ■ Appendix M is the Draft Land Evaluation and Site Assessment(LESA) <br /> Evaluation. <br /> ■ Appendix N is the Applicant's Noise Control Plan. <br /> r <br /> r <br /> r <br /> r DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 1.5 <br /> AS 05105.05 <br />