Laserfiche WebLink
10/17/2007 14:37 FAX 2094683163 SJC_COMM_OEV laO09/013 <br /> salvage,maintenance,and redistribution. Any imported backfill will be screened and <br /> tested in accordance with state standards. <br /> Response to Comment 7 <br /> The recycling plant is described in Chapter 2,"Project Description,"on page 2.10 of the <br /> Draft EIR under"Recycling Plant." The Draft EIR disclosed that the project includes <br /> operation of a recycling plant to recycle existing concrete materials that would be <br /> imported to the site via trucks.Chapter 2,"Project Description,"and Chapter 3H, <br /> "Groundwater and Groundwater Quality,"describe the material that will be recycled.The <br /> material will only be concrete.Any steel that in used in reinforcing concrete will be <br /> properly disposed of offsite.The potential effects on groundwater from the recycling <br /> plant are covered in Impacts GW-1 and GW-2 beginning on page 30-6 of the EIR. <br /> Operations from the concrete recycling operation will not produce anything different <br /> from regular operations,in concrete material <br /> not come into <br /> adequatelyBaewatergro war.Impacts o groundwater ter quality were <br /> aas nthR <br /> Response to Comment 8 <br /> As described under"Haul Routes"in Chapter 2,"Project Description,"on page 2-9 of the <br /> Draft ETR,the Caltrans and the County have prohibited right-turn access from SR 132 <br /> onto Koster Road. Trucks would access the site via South Bird Road to Blewett Road to <br /> Koster Road and would enter the site with a left-hand turn at the site entrance located on <br /> Koster Road. Trucks exiting the site would turn right at the site entrance on Koster Road <br /> and follow the same route out. <br /> Response to Comment 9 <br /> Jimpact LU-1 on page 3.13-10 of the <br /> of th25-acre p nd from any pot ntial stormwaterETR was revr ffdit (lows to clarify.protection w s pp a::wp"•,; <br /> Iande:7Te <br /> uno <br /> �°!br!rclr,irc <br /> If the 25-acre agricultural pond is constructed,buffer zones will be placed around <br /> the pond - - - - enter the pond.Inaddition,a <br /> small berm will be placed around the pond with an infiltration grassy swale on the <br /> outside of the berm to collect stormwter runoff and also serve as an erosion <br /> control device for the berm. <br /> -- isttieeaii�di:ih'iddn'e:iie,'Irfd":(i•ri!'ir'': <br /> See response to Commen above re ardin the ase ofliackfiilll. <br /> VIJ <br /> Response to Comment 10 <br /> As discussed in the response to Comment 3,above,detailed analysis of eroundwater <br /> n itio0,s including the ite-snzcif n _cumulative impacts o eroundwater pumping <br /> for_Uu_arrv_use,were including in the EiRs for_the Granite Conshuction quarry and the <br /> RMC Pacific quarry. in particular,the RMC Pacific EIR notes That pun�f uo <br /> to 1,000 epm will result in water level changes that are less than normal seasonal <br /> fluctuations of the groundwarcr levels in nearby wells,based on water-level data that <br /> have been recorded by the California Department of Water Resnumes over the last <br />