Laserfiche WebLink
Dust Control Plan <br /> Section 4 — Dust Control Methods — Page 1 <br /> Project Name: <br /> 4-A Water Application <br /> Complete this section if water application will be used as a control method for limiting visible dust <br /> emissions and stabilizing surface areas. Check and answer everything that applies to this project. <br /> (Rule 8021 Sec.6.3.6.6) <br /> Water Application Equipment: <br /> ❑ Sprinklers: Describe the activities that will utilize sprinklers: <br /> — Minimum treated area: ❑ Square Feet❑ Acres <br /> Maximum treated area: ❑ Square Feet❑ Acres <br /> Minimum water flow rate: Duration: <br /> ❑ Water Truck, ❑ Water Trailer, ❑ Water Wagon, ❑ Other: <br /> Describe the activities that will utilize this equipment: <br /> Number of application equipment available: <br /> Application equipment capacity: <br /> Application frequency: <br /> Application rate: Gallons per acre per application <br /> Hours of operation: <br /> Water application equipment is available to operate after normal working hours, on weekends, and holidays. <br /> After-hours contact: Phone No.: <br /> After-hours contact: Phone No.: <br /> Water Supply: Include the relative locations of these sources on the plot plan in Section 2. <br /> ❑ Fire hydrants <br /> Number of hydrants available On-Site: Off-Site: <br /> Approval granted by the owner or public agency to use their fire hydrants for this project. <br /> Owner or Agency: <br /> Contact: Phone No.: <br /> ❑ Storage tanks Number and capacity: <br /> ❑ Wells Number and flow rate: <br /> ❑ Canal, River, Pond, Lake, etc. Describe: <br /> Approval granted by the owner or public agency to use their water source for this project. <br /> Owner or Agency: <br /> _ Contact: Phone No.: <br /> ❑ Other: <br /> 10/14/2004 <br />