My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P-9 Follow-up tests of asphalt plant and Portland cement concrete plants should be conducted <br /> to determine whether those sources, while operating independently or concurrently, would <br /> cause noise levels to exceed the project objectives during either daytime or nighttime hours. <br /> If it is determined from those test that the objectives would be exceeded, source specific <br /> noise control measures such as partial or complete enclosures, suspended curtains, lining <br /> of chutes and hoppers with sound damping materials, etc., should be specified to reduce <br /> the noise to acceptable levels. <br /> Mining Area Noise Sources <br /> As indicated in Table 2, mining area equipment is predicted to satisfy the daytime noise level <br /> objectives at all residences in the immediate project vicinity following construction of proposed <br /> berming, with the exception of receiver E1. However, mining noise could exceed the nighttime <br /> criteria if excavation occurs prior to 7 am. The following measures should therefore be <br /> .. implemented to mining area noise sources to ensure satisfaction with both the daytime and <br /> nighttime noise levels objectives at all of the nearby residences, and fully mitigate noise impacts <br /> at those locations: <br /> M-1 Excavation activities should be limited to the hours of 7 am to 7 pm. <br /> M-2 Mobile excavation equipment should be shut off when not in use to minimize idling noise. <br /> M-3 The proposed earthen berms should be constructed prior to commencement of mining <br /> activities within 1,000 feet of an existing residence. <br /> M-4 At receiver E-1, the Table 2 data indicate that the 50 dB Leq daytime standard could be <br /> exceeded even with construction of the proposed earthern berm at that location. As a <br /> _ result, excavation should not encroach within 500 feet of the project site boundary until <br /> noise testing can be conducted to verify that mining activity could occur closer to this <br /> residence without causing exceedance of the 50 dB Leq daytime standard. <br /> Page -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.