Laserfiche WebLink
CALCULATION OF PROJECT TRAFFIC VOLUMES <br /> Proposed RMC Minina Site <br /> Vernalis, California <br /> Truck Working Seasonal Adjusted Working Peak Hour <br /> Annual Production Capacity Truckloads Days per Truckloads Adjustment Truckloads Hours Per Truckloads Adjustment Peak Hour <br /> (tonslyear) (tons) per Year Year per Day Factor per Day Day per Hour Factor Truckloads <br /> 4,000,000 (maximum) 25 160,000 261 613 1.6 981 a 123 1.25 153 <br /> SUMMARY <br /> Daily Peak Hour Peak Hour <br /> Production Trips Daily Trips Total Daily Trips Trips Total Peak <br /> Condition Entering Exiting Trips Entering Exiting Hour Trips <br /> Maximum 981 981 1,962 153 153 307 <br />