Laserfiche WebLink
HCM Unsignalized Intersection Capacity Analysis Cumulative With Project Haul Route 3 <br /> 3: SR 132 & Welty Road 5/27/2005 <br /> Lane Configurations <br /> Grade 0% 0% 0% <br /> Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 <br /> Pedestrians <br /> Walking Speed(fls) <br /> Right tum flare(veh) <br /> Median storage veh) <br /> pX, platoon unblocked <br /> vC1, stage 1 conf vol <br /> vCu, unblocked vol 242 1202 242 <br /> 111111 mpP! <br /> tC, 2 stage (s) <br /> p0 queue free % 99 97 98 <br /> Volume Left 0 17 0 5 <br /> cS_H 1700 1324 1700 321 <br /> Queue Lengthp9�ft � , .r <br /> �oti C <br /> _ ( ) 0 3 <br /> Lane LOS A C ' ' <br /> Approach LOS C �� �`, <br /> Average Delay 0.3 <br /> Analysis Period (min) 15 <br /> Synchro 6 Report <br /> Peters Engineering Group Page 3 <br /> r <br /> r <br />