western portion of Phase I to allow mining of Phase VIII. All processing equipment will be removed upon <br /> final reclamation. <br /> The proposed mining operation would consist of the extraction of 1.7 to 4.0 million tons per year of <br /> aggregate materials (sand and gravel) over a 26-to 60-year time period, depending on market <br /> conditions. Mining would begin approximately one year after San Joaquin County and Stanislaus <br /> County approve the project and would initially utilize a portable aggregate processing plant while the <br /> stationary plant is constructed. The operation would be open pit, sand and gravel harvesting and <br /> processing. A mining plan was developed based on reviewing over 35 soil borings completed on the <br /> Project site. Mining depths would vary from 70 to 120 feet below ground surface, depending on the <br /> groundwater level. No mining would occur in the groundwater aquifer. <br /> In addition to the mining operation, the project would include a processing plant, a ready <br /> mix concrete plant, an asphalt plant, recrushing/recycling of broken concrete and office facilities. The <br /> maximum hours of operation for both excavation and processing would be 24 hours per day, six days <br /> per week (Monday through Saturday), with maintenance occurring on Sundays. <br /> A paved entrance to the plant and office site would be constructed off Koster Road. A landscaping screen <br /> would be developed within a 50-foot setback along Blewett Road and the northern portion of Koster <br /> Road, from Blewett Road to the entrance of the mining facility, to screen operations from the roadways. <br /> The entire site would be enclosed with either existing or new fencing. Figure 3-3 3=6 and Figure 34 33=7 <br /> depict the locations, features, and phases of the proposed mining operation. <br /> 3.6.1 Site Preparation and Construction <br /> Site Clearing and Grading <br /> Mining would be initiated by first clearing and grubbing the project site of vegetation, trees, structures and <br /> debris. The trees and vegetation will be mulched by an outside contractor and used in the on-site <br /> landscaping. Excess mulch will be removed from the site. The house and barn <br /> located in Phase II will be moved to Parcel'A" moved off-site, or demolished just prior to mining that <br /> phase. The other structures (mobile homes)will be removed from the site. General debris will be recycled <br /> or removed from the site using roll-off debris containers. <br /> Scrapers and dozers will remove approximately 800,000 cubic yards of topsoil during each phase and <br /> stockpile it along the perimeter setbacks. The topsoil will be used in reclamation. Scrapers and dozers will <br /> strip the overburden, using it for the construction of building pads for the structures and for <br /> screening/landscape berms. The majority of the overburden will be stockpiled and used in reclamation. <br /> Other equipment used for clearing the site would be a water truck, grader and loader. <br /> San Joaquin County QX-01-2\Lonestar California <br /> Community Development Page 3 <br />