Laserfiche WebLink
TABLE OF CONTENTS <br /> CHAPTER 7 EIR AUTHORS AND CONSULTANTS..............................._......................7-1 <br /> SanJoaquin County...........................................................................................7-1 <br /> EIRConsultants.................................................................................................7-1 <br /> CHAPTER8 ACRONYMS........................»........._.............................................................8-1 <br /> CHAPTER 9 REFERENCES...............................................»................................................9-1 <br /> LIST OF TABLES <br /> 2-1 Summary of Impacts and Mitigation Measures..............................................2-5 <br /> 3-1 Proposed Project Features and Characteristics..............................................3-18 <br /> 3-2 Proposed Project Mining and Reclamation Schedule...................................3-19 <br /> 4.3-1 Important Farmland Acreage Summary.......................................................4.3-2 <br /> 4.3-2 Summary of Williamson Act Contracts.......................................................4.3-7 <br /> 4.3-3 Farmland Conversion from 1998-2000 in <br /> Stanislaus and San Joaquin Counties ...........................................................4.3-8 <br /> 4.4-1 Level of Service Characteristics for Unsignalized Intersections.................4.4-7 <br /> 4.4-2 AM Peak Hour Intersectoin Level of Service Summary..............................4.4-8 <br /> 4.4-3 AM Peak Hour Road Segment Level of Service Summary.........................4.4-9 <br /> 4.4-4 Project Trip Generation..............................................................................4.4-12 <br /> 4.4-5 Traffic Index(20-Year) Summary..............................................................4.4-18 <br /> 4.5-1 Maximum Allowable Noise Exposure.........................................................4.5-8 <br /> 4.5-2 Long-Term Noise Monitoring Data............................................................4.5-10 — <br /> 4.5-3 Typical Construction Activity Noise Levels..............................................4.5-12 <br /> 4.5-4 Typical Construction Equipment Noise Levels..........................................4.5-13 <br /> 4.5-5 Existing and Projected Morning Peak-Hour Traffic Noise Levels _ <br /> Along Local Roadways ..............................................................................4.5-17 <br /> 4.6-1 State and National Criteria Air Pollutant Standards, <br /> Effects, and Sources .....................................................................................4.6-5 <br /> 4.6-2 Attainment Status for the State and <br /> National Ambient Air Quality Standards.....................................................4.6-9 <br /> 4.6-3 Air Quality Data Summary (1997-2003)for the Project Area..................4.6-15 _ <br /> 4.6-4 Operational Emissions................................................................................4.6-22 <br /> 4.7-1 Soils within Proposed RMC Pacific Vernalis Quarry Project Site..............4.7-3 <br /> 4.7-2 Modified Mercalli Intensity Scale................................................................4.7-6 _ <br /> 4.7-3 Active and Potentially Active Regional Faults <br /> in the Vicinity of the Proposed RMC Pack Vernalis Quarry....................4.7-7 <br /> 4.8-1 Hydrologic Characteristics of Adjacent and <br /> Contributing Watersheds to the Project Site................................................4.8-2 <br /> 4.8-2 Groundwater Wells in the Project Vicinity..................................................4.8-8 <br /> 4.8-3 Definitions of Beneficial Uses of Surface Waters for the Project Area.....4.8-17 <br /> 4.8-4 Results for Drawdown Analysis after 240 Days for 60 GPM, 100 GPM, <br /> 500 GPM,and 1,000 GPM Continuous Pumping......................................4.8-27 <br /> 4.9.1 Special-Status Species..................................................................................4.9-5 <br /> RMC Pacific Vernalis Quarry Mining and Reclamation P ject iv FSA/203015 <br /> Admini.,M6ve Draft HR Match 2004 <br />