My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 t I t 1 I 1 I 1 ( I f f f i fi C 1 <br /> 2. EXECUTIVE SUMMARY <br /> TABLE 2-1 (Continued) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> LEVEL OF <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES SIGNIFICANCE <br /> AFTER MMGATION <br /> 4.8.1b Maintaining Excavation/Groundwater Separation <br /> In the event that the water table level increases unexpectedly <br /> over a short period of time or an increase occurs that is not <br /> identified through monitoring(see Mitigation Measure 4.8.1c) <br /> and the water table rises to an elevation less than the required <br /> separation distance,the applicant shall cease vertical excavation <br /> in the affected area and place surface fill on the basal mining <br /> surface to establish the required separation. Fill placement shall <br /> be supervised by a California-certified engineering geologist <br /> and be engineered by a California-registered civil engineer to <br /> adequately support heavy equipment. <br /> 4.8.1c Groundwater Elevation Monitoring Schedule Less-than-Significant <br /> The applicant shall monitor groundwater to ensure that the <br /> vertical separation between the nearest groundwater surface and <br /> the lowest point of the active excavation and reclaimed phases <br /> is maintained as required by the California-certified <br /> hydrogeologist or at no less than 5 feet. The groundwater levels <br /> shall be monitored onsite prior to and during all phases of <br /> excavation,prior to the initiation of excavation for each phase, <br /> and in the reclaimed phases. Groundwater shall be continually 7 <br /> mor n +n rhe anti ve mininc area on a bi-monthl basis and <br /> within a week followini;each lazeyrainstorm from Octo <br /> Tr <br /> through April,and on a monthly basis during the remainder of <br /> the year. Reclaimed phases shall be monitored once monthly. <br /> Monitoring technique shall be based on recommendations and <br /> approval by a California-certified hydrogeologist. <br /> RMC Pack Vemaas Quarry Mining end Rede don Project 2-19 ESA/203015 <br /> Administrative Dmn FIR Mmsh 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.