Laserfiche WebLink
I EXECUTIVE SUMMARY <br /> TABLE 2-1 (Continued) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> LEVEL OF <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES SIGNIFICANCE <br /> AFTER MITIGATION <br /> 4.9.2d Prior to development of any Phase of mining which would <br /> commence during the raptor and shrike breeding season(March <br /> 15 through August 31)pre-construction surveys for nesting <br /> raptors and shrikes shall be conducted in suitable habitat within <br /> 500 feet of the Phase boundaries. Surveys shall begin either at <br /> the beginning of the breeding season,or four weeks prior to <br /> beginning mining activities in the Phase,whichever is later. If <br /> nesting raptors are recorded within a 500-foot buffer from the <br /> Phase,or shrikes within a 100-feet buffer,CDFG will be <br /> consulted regarding suitable measures to avoid impacting <br /> breeding effort. Measures may include,but are not limited to: <br /> 1) Maintaining a 500 foot buffer around each active raptor nest <br /> and a 100-foot buffer for shrike nests;no construction <br /> activities shall be permitted within this buffer except as <br /> described in Mitigation Measure 4.9.2c(2). This buffer may <br /> be reduced in consultation with CDFG. <br /> 2) Depending on conditions specific to each nest,and the <br /> relative location and rate of construction activities,it may <br /> be feasible for mining to occur as planned within the buffer <br /> without impacting the breeding effort. In this case(to be <br /> determined in consultation with CDFG),the nest(s)shall be <br /> monitored by a qualified biologist during mining operations <br /> within the buffer. If,in the professional opinion of the <br /> monitor,the project would impact the nest,the biologist <br /> shall immediately inform the applicant and CDFG. The <br /> applicant shall stop construction activities within the buffer <br /> until either the nest is no longer active or the project <br /> receives approval to continue from CDFG. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Pmiw 2-28 ESA/203015 <br /> Administrative Draft Eat March 2004 <br />