Laserfiche WebLink
( r r r F i 1 1 I C f r f r <br /> 2. EXECUTIVE SUMMARY <br /> TABLE 2-1 (Continued) <br /> SUMMARY OF IMPACTS AND NMGATION MEASURES <br /> LEVEL OF <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES SIGNWICANCE <br /> AFTER MITIGATION <br /> HAZARDS AND HAZARDOUS MATERIALS <br /> 4.11.1 There is the potential for existing and/or previously 4.11.1 If contaminated soil and/or groundwater are encountered or Less-than-Significant <br /> unidentified contamination to be encountered during suspected contamination is encountered during site clearing, <br /> project site preparation,construction activities,and construction activities,and mining activities,work shall be <br /> mining activities. A leaking underground storage tank halted in the area of concern. The Applicant shall determine the <br /> site(Fallon Tank Company)was identified in the type and extent of the contamination by consulting with the <br /> database search as being located near the intersection of appropriate regulatory agencies(RWQCB,DTSC,and/or the <br /> South Costa Ranch Road(formerly Koster Road)and San Joaquin or Stanislaus County Health Department)and <br /> Blewett Road. The exact location could not be implementing any necessary measures,such as soil and/or <br /> determined. The agencies who would oversee this type groundwater sampling and analysis. If required by the <br /> of case were contacted. There are no records on file for regulatory agencies,a remediation plan shall be implemented <br /> this site with the Department of Toxic Substances either in conjunction with or prior to continued project <br /> Control,the Regional Water Quality Control Board,or construction and/or mitring activities. <br /> the San Joaquin County Environmental Health <br /> Department. Encountering contaminated soil,surface <br /> water,and groundwater without taking proper <br /> precautions could result in the exposure of construction <br /> workers and consequently result in associated <br /> significant adverse human health and environmental <br /> impacts. This would be a potentially significant impact. <br /> RMC Pacific Vemahs Quany Mining and Reclamation Project 2-33 ESA/203015 <br /> Adn inistrative Draft EIR <br /> Mach 2004 <br />