Laserfiche WebLink
2. EXECUTIVE SUMMARY <br /> TABLE 2-1(Continued) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> LEVEL OF <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES SIGNIFICANCE <br /> AFTER MITIGATION <br /> VISUAL RESOURCES <br /> 4.12.1 Implementation of the Proposed Project has the No mitigation is required. Less-than-Significant <br /> potential to adversely impact scenic views of the <br /> Coastal Range Mountains and San Joaquin Valley. This <br /> is a less-than-significant impact. <br /> 4.12.2 Implementation of the Proposed Project has the 4.12.2 Features tall enough to he seen above the visual screening Less-than-Significant <br /> potential to conflict with adopted Plans and Policies (processing plant,conveyor towers,loading hoppers,etc.)shall <br /> relating to visual resources. This is a potentially be painted in such a way to minimize their visibility. These <br /> significant impact. structures shall be painted in such a way to blend in with their <br /> surroundings. <br /> RMC Pacific Vernalis Quany Mining and Reclamation Project 2-36 FSA 1203015 <br /> Adminismfive Draft EIR Mash 2004 <br />