My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L3. PROJECr DESCRIPTION <br /> LA bag house will be used on most crushers,dry screens, transfer points, and all plants to control <br /> airborne dust and emissions. A bag house is typically a large metal box that contains fabric filter <br /> L "bags"to remove dust particles from the air. <br /> LPLANT CONSTRUCTION <br /> The plant construction will commence once the site preparation and grading of the plant site has <br /> been completed. The stationary plant will be constructed in the Phase IX area. The general plant <br /> Llayout is depicted in Figure 3-5. The general components of the aggregate plant include: <br /> • Primary crushing and screening tower <br /> • Surge pile <br /> • Three secondary and tertiary crushing and screening towers <br /> • Wet side washing and screening tower <br /> • Product stockpiles <br /> • Drive under product load-out tower <br /> • Radial stacker conveyor <br /> • Conveyors <br /> LAt its highest point,the aggregate plant will be 65 feet tall. <br /> LCONSTRUCTION OF ANCILLARY USES <br /> READY NIIX CONCRETE PLANT <br /> LA ready mix concrete batch plant will be constructed within the Phase IX area to the northwest of <br /> the aggregate plant. Figure 3-5 depicts the location of the batch plant.The concrete batch plant, <br /> L with an estimated production of 350,000 cubic yards per year, would have an office measuring <br /> approximately 500 square feet in size. The major components of the batch plant include: <br /> • Cement silos <br /> • Aggregate bins <br /> • Conveyors <br /> • Baghouse <br /> • Bermed admixture tank farm <br /> • Concrete reclaimer <br /> • Concrete lined washout basins <br /> L ASPHALT PLANT <br /> An asphalt batch plant will be constructed within the Phase D{area to the southwest of the <br /> Laggregate plant and south of the ready mix batch plant. Figure 3-5 depicts the location of the <br /> asphalt plant. The asphalt plant, with an estimated production of 400,000 tons per year, would be <br /> L owned and operated by a tenant of the applicant. The height of the structures and equipment <br /> would be approximately 65 feet to 100 feet above ground level. The tallest structure would be the <br /> asphalt plant tower, which would stand approximately 100 feet above ground level. The asphalt <br /> L plant would have an office approximately 500 square feet in size. The major components of the <br /> hot plant include: <br /> Y <br /> L <br /> RMC Pacific Veroahs Quarry Mining and Reclamation Project 3-15 ESA 1203015 <br /> L Administrative Draft EIR March 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.