Laserfiche WebLink
4. ENVIRONMENTAL ANALYSIS <br /> 4.4 TRANSPORTATION AND CIRCULATION <br /> TABLE 4.4-3 <br /> AM PEAK HOUR ROAD SEGMENT LEVEL OF SERVICE SUMMARY <br /> Level of Service <br /> Cumulative Cumulative Future Future <br /> Existing With With Future (2025)With (2025)With <br /> With Cumulative Project Haul Project Haul (2025) Project Haul Project Haul <br /> Road Seasonal Without Route Route Without Route Route <br /> Segment Existing Adjustments Project Option 1 Option 2 Project Option 1 Option 2 <br /> Bird Road <br /> Blewett to SR 132 A A B C C B C C <br /> SR 132 <br /> Chrisman to Bird'* D D D E E F F F <br /> Bird to I-5 A A A A A B C B <br /> 1-5 to Koster* D D D D E F F F <br /> Koster to McCracken D D D D D F F F <br /> Blewett Road <br /> Bird to I-5 A A A B A A B B <br /> 1-5 to Koster <br /> * The reported level of service is based on a two-lane highway. Where the existing highway consists of four lanes,the levels of service are LOS C or better. <br /> Source: Peters Engineering,2004 <br /> RMC Pacific Vemalis Quarry Mining and Reclamation Project 4.4-9 ESA/203015 <br /> Administrative Draft EIR March 2004 <br />