Laserfiche WebLink
5. ALTERNATIVES <br /> PROCESSING MATERIAL EXTRACTED AT THE PROJECT SITE AT THE _ <br /> EXISTING RMC PACIFIC MATERIALS' TRACY FACILITY <br /> Description <br /> This alternative would have assessed the potential of extracting aggregate at the Project site then <br /> transporting the raw or semi-processed material to the existing and/or new plant located at the <br /> Applicant's Tracy Facility. <br /> Basis for Selection <br /> The Applicant has stated in their updated application(December 2003,that the proposed project <br /> is a replacement facility for their Tracy Plant. The Tracy Facility will be depleted of reserves in <br /> three to ten years. According to the Division of Mines and Geology, 82% of the material <br /> produced in the TracyNemalis area satisfies market demand to the north in the Stockton area. <br /> Utilizing an existing facility closer to the market, potentially reducing traffic,noise,air quality, <br /> and visual impacts at the project site may be a more environmentally sensitive alternative. <br /> Distinctive Environmental Characteristics <br /> The following summarizes potential impacts of the"Processing Material Extracted at the Project <br /> Site at the Existing RMC Pacific Materials' Tracy Facility"alternative: <br /> The material extracted at the project site would be taken to an existing facility that is already <br /> processing material. This would serve to reduce some of the impacts to the project site. The <br /> visual impacts would be reduced to residents near the project site and those traveling along <br /> Blewett and Koster Road. The construction and operations emissions would be reduced by not _ <br /> having a processing facility at the project site. The noise impacts from processing materials at the <br /> site would be eliminated with this alternative. <br /> However,there would still be truck traffic in the Vernalis area due to the trucks taking the — <br /> extracted material to the existing Tracy Facility. Truck traffic might actually be increased <br /> because the trucks would then need to make additional trips when traveling to the Tracy Facility <br /> to pick up and deliver the material after it has been processed. <br /> 5.2 ALTERNATIVES EVALUATED IN THIS EIR _ <br /> ALTERNATIVE 1 -NO PROJECT ALTERNATIVE <br /> DESCRIPTION <br /> The No Project Alternative is defined as the continuation of the existing condition(baseline)and <br /> trends in the project area. This alternative would involve no action on the part of San Joaquin <br /> County or the Applicant for development of the Proposed Project. Under this alternative,the _ <br /> proposed mining and processing would not occur,and the project site would remain as <br /> agricultural land and rural residential in its existing condition,as described in Chapter 3.0, <br /> Project Description,and in the setting sections of Chapter 4.0 of this EIR. No General Plan — <br /> RMC Pacific Vernalis Qua. Minting and Reclamation Project 5-6 ESA/203015 <br /> Admhnisttatwc Draft EIR Minch 2004 <br />