Laserfiche WebLink
6. OTHER STATUTORY CONSIDERATIONS <br /> cumulative environmental impacts. There are no other types of projects,such as large residential, — <br /> commercial or industrial development in the area. <br /> TABLE 6-1 _ <br /> SURROUNDING PROPOSED AND APPROVED PROJECTS <br /> Name of <br /> Mine ffkt Project Acreage Location Description of Project* Status ` <br /> Vernalis Area Sites <br /> 91-39-0029 DSS Quarry 142-acre South Koster Road Aggregate mining and plant Currently _ <br /> Vemalis Plant site approximately rh production of 400,000 tons per operating <br /> mile south of the year in the first seven years,and <br /> intersection of 550,000 tons per year during each <br /> Blewett and Koster of the remaining 49 years. _ <br /> Roads (estimated)(no expiration daze) <br /> (production is not conditioned to <br /> the above) <br /> 91-39-0021 Teichert 820 or Located within and Aggregate training and plant Currently <br /> Aggregates,Inc. 881-acre adjacent to the production of 2 million tons per operating <br /> Vernalis Plant site triangle formed by year initially to increase to 4 <br /> State Route 132, million tons by 2015. <br /> Interstate 5,and <br /> Interstate 580 <br /> Unknown Granite 323-acre Northeast corner of Aggregate minin and plant Permitted but <br /> Construction site Gaffery and Koster production of 625,000 tons per never _ <br /> Company Roads year initially to increase to constructed. <br /> (Stanislaus Co.) 2,800,000 tons per year by 2010. The application <br /> has expired <br /> 91-394M Granite 379-acre North of the Expansion of an existing quarry Currently ` <br /> Construction site Interstate 5 and to excavate sand and gravel from operating <br /> Company Interstate 580 Hospital Creek alluvial fan. Plant <br /> (formerly freeway junction production to be 300,000 tons in <br /> Brown Sand and the fust year of operation,and — <br /> Gravel) increasing by 100,000 tons every <br /> Vernalis Plant two years. The maximum <br /> production of 2 million tons per <br /> year would occur in 2033. - <br /> --------------- ----- -----.............................— <br /> Unlnuown DeSilva-Gates 218-acre State Route 132 and 155 of 218 acres tentatively Application <br /> site South Koster Road proposed to be excavated. only <br /> Tracy Area Sites <br /> 91-39-0005 Teichert -- 29099 South Mac The Rose site(91-39-005)is Currently <br /> 91-39-"6 Aggregates Arthur south of closed and reclaimed(2.08 mcy Operating <br /> 91-39-0007 Tracy Plant Linne Road of sand and gravel from 50.6 <br /> 91-39-0024 acres). <br /> The Flintkote/]lraina West/ <br /> Mitchell-Sexton site(91-39-006) <br /> Renewal of a permit to excavate — <br /> 11.5 mcy of sand and gravel in <br /> three phases. <br /> There is no information on the <br /> Pedera site(91-39-0007) <br /> The Traina East(91-39-0024)is <br /> reclaimed(9 million tons of sand <br /> and gravel from 147 acres) <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 6-4 ESA/203015 <br /> Administrative Draft QR Mach 2004 <br />