Laserfiche WebLink
6. OTHER STATUTORY CONSIDERATIONS <br /> r <br /> 6.5 EFFECTS NOT FOUND TO BE SIGNIFICANT <br /> As required by CEQA, this Draft EIR focuses on expected significant or potentially significant <br /> environmental effects(CEQA Guidelines Section 15143). An Initial Study was prepared for the <br /> Proposed Project to identify issues to be evaluated in this EIR. Comments received on the Notice <br /> of Preparation that helped to further refine the list of environmental issues to be evaluated in this <br /> r. EIR are included in Appendix A. <br /> A summary of resource-specific issues that were eliminated from detailed analysis in this EIR is <br /> provided in the Initial Study and in Chapter 2, Section 2.3 of this Draft EIR. Some of the impacts <br /> analyzed in this EIR are considered to be less-than-significant and require no mitigation. Other <br /> impacts, (i.e., those which are considered to be significant)can be reduced to a level that is less- <br /> than-significant with the implementation of the proposed mitigation measures. <br /> All of the impacts analyzed in this EIR, including those considered to be less-than-significant,are <br /> summarized in Table 2-1 in Chapter 2.0,Executive Summary,of this document. <br /> ti <br /> RMC Pacific Vemalis Quarry Mining and Reclamation Project 6-17 FSA/203015 <br /> Administrative Draft EIR Mash 2004 <br />