Laserfiche WebLink
b. Will the project result in increased noise or vibration levels? ®Yes ❑ No <br /> Other sources used: <br /> 6. Energy/Natural Resources: <br /> a. Will the project use substantial amounts of fuel or energy, require a <br /> substantial increase in demand upon existing sources,or require the <br /> development of new sources of energy? I ❑Yes ® No <br /> b. Will the project affect the potential use, extraction,conservation, <br /> or depletion of a natural resource(other than agricultural land)? Dyes QQ No <br /> Other sources used: <br /> 7. Hazards: <br /> a. Will the project create a risk of explosion; release, generate or store <br /> Any hazardous substances;or cause other dangers to public health and Dyes KA No <br /> safety? <br /> b. Are there any known hazardous substances located within 500 feet of <br /> the boundaries of this project, if in an existing or proposed residential <br /> area (this could include possible groundwater contamination)? Dyes g No <br /> c. Will the project result in interference with, or need for, emergency plans? Dyes ® No <br /> Other sources used: <br /> 8. Utilities and Public Service: <br /> a. "Will the project require alteration of, addition to, or the need for new <br /> utility systems(water, sewer, drainage,solid waste), including a ❑ <br /> Sphere of Influence or district boundary change? Yes No <br /> b. "Will the project result in the need for or the expansion of the following <br /> services: fire and police protection,schools,parks and recreation, <br /> libraries, roads, flood control,solid waste or other public works Dyes No <br /> facilities,public transit,or governmental services? <br /> c. Will the project adversely impact existing recreational/park <br /> opportunities or require new park/recreationopportunities? ❑Yes Q No <br /> Note: ** "Yes" answers to these two questions and 9 (b) below will require <br /> additional discussion,but do not necessarily indicate a potentially significant impact. <br /> Other sources used: <br /> 9. TransportationlCirculation: <br /> a. Will the project generate significant traffic volumes and/or make a <br /> Initial Study -4 - Rev 5-00 <br />