Laserfiche WebLink
Traffic Impact Study March 24,20134 <br /> Proposed RMC Pacific Mining Site Page i <br /> TABLE OF CONTENTS <br /> Page _ <br /> 1.0 INTRODUCTION........................................................................................................................ 1 <br /> 2.0 PROPOSED PROJECT .............................................................................................................. 1 <br /> 3.0 APPROVED PROJECTS............................................................................................................1 - <br /> 4.0 STUDY AREA AND TIME PERIOD........................................................................................ 1 <br /> 5.0 EXISTING LANE CONFIGURATIONS..................................................................................2 <br /> 6.0 TRAFFIC ANALYSES................................................................................................................2 <br /> 6.1 Project and Approved Project Traffic Volumes.................................................................2 _ <br /> 6.2 Existing and Cumulative Traffic Volumes.........................................................................3 <br /> 6.3 Future (Year 2025) Traffic Volumes .................................................................................3 <br /> 6.4 Level of Service .................................................................................................................4 _ <br /> 6.5 Discussion of Analyses......................................................................................................5 <br /> 7.0 FAIR-SHARE PERCENTAGE..................................................................................................9 <br /> 8.0 CONCLUSIONS AND RECOMMENDATIONS................................................................... 10 <br /> TABLES <br /> 1 Project Trip Generation <br /> 2 Traffic Index (20-Year) Summary - <br /> 3 Level of Service Characteristics for Unsignalized Intersections <br /> 4 Level of Service Characteristics for Signalized Intersections <br /> 5 AM Peak Hour Intersection Level of Service Summary - <br /> 6 AM Peak Hour Road Segment Level of Service Summary <br /> 7 AM Peak Hour Fair Share Calculations-Haul Route 1 <br /> 8 AM Peak Hour Fair Share Calculations-Haul Route 2 <br /> FIGURES <br /> 1 Site Vicinity Map <br /> 2 Trip Distribution Percentages-Haul Route 1 <br /> 3 Trip Distribution Percentages-Haul Route 2 <br /> 4 Intersection and Segment Location Map <br /> 5 Existing Lane Configurations _ <br /> 6 Existing Lane Configurations <br /> 7 Project Traffic Volumes-Haul Route 1 <br /> 8 Project Traffic Volumes-Haul Route 1 <br /> 9 Project Traffic Volumes-Haul Route 2 <br /> 10 Project Traffic Volumes-Haul Route 2 <br /> 11 Approved-Project Traffic Volumes- Granite Site - <br /> 12 Approved-Project Traffic Volumes-Granite Site <br /> 13 Existing Traffic Volumes <br /> 14 Existing Traffic Volumes <br />