Cemex Vernalis Quarry Mining and Reclamation Project <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Party Monitor Timing Sign Off <br /> regarding any additional measures needed. <br /> • Reconfigure traffic stripes and trim or remove trees and vegetation to eliminate horizontal sight <br /> distance constraints. <br /> • Construct acceleration and deceleration lanes at the intersection for trucks turning right onto <br /> southbound Welty and northbound trucks turning left onto State Route 33. <br /> 4.4.2:Implement Mitigation Measure 4.4.1b. Applicant PW Ongoing <br /> 4.43:Pavement Upgrades and Replacement.As a condition of approval,the project applicant or Applicant PW Prior to issuance of <br /> successor-in-interest will be required to enter into an agreement with the San Joaquin County Grading or Building <br /> Department of Public Works regarding the replacement/upgrade and maintenance of roadways Permits <br /> affected by the project. Upgrades and replacements will be completed to the Traffic Index identified <br /> in Table 4.4-5,unless the County determines the need for a different Traffic Index based on future <br /> traffic counts. <br /> 4.5 NOISE <br /> 4.5.1a: At the start of stripping operations for each phase,the applicant shall construct an earthen Applicant CDD Prior to each phase <br /> berm along the portions of the project site that face sensitive receptors located within 2,000 feet of (improvement plan <br /> mining operations for that phase.This includes residences R4 and R5 northeast of Phase I(this approval or mining <br /> earthen berm would also attenuate noise to residences R5,R6,and R7)and residences R1,R2,and activity,whichever <br /> R3,west of Phase III and southwest of Phase IV.The sound barriers must be at sufficient height occurs first) <br /> (approximately 10 feet)to block the line of sight to the nearest sensitive receptor.If continuous <br /> earthen berms of adequate size are already in place,additional berms would not needed. <br /> 4.5.1 b:The Applicant shall conduct additional noise measurements after the completion of initial Applicant CDD Prior to Phase 11 <br /> stripping activities to evaluate the effectiveness of Mitigation Measure 4.5.1a in reducing resultant (improvement plan l <br /> sound levels at outdoor activity areas of nearby sensitive receptors.For those residences existing as approval or mining <br /> of project approval requiring additional sound reduction,the Applicant shall fund the construction of activity,whichever <br /> solid walls(masonry walls or other similar construction)along those property lines of the residences occurs first) <br /> facing the project site,if desired and allowed by the subject property owners. <br /> 4.5.1c: For any residences existing as of project approval that would exceed an interior noise level Applicant CDD Ongoing <br /> of 45 dBA,Leq indoors,the applicant shall upgrade house noise reduction via window,and door <br /> upgrades on the side of the houses facing the mine,if the landowner desires and allows the work to <br /> be done. <br /> 4.5.1d:Nighttime mining shall be prohibited within 1,000 feet of residences unless noise Applicant CDD Ongoing <br /> measurements confirm that noise levels are below 45 dBA,L.at the outdoor activity areas of <br /> adjacent residences. <br /> Comex Vernalis Quarry Mining and Rodamation Project 5-4 ESA/203015 <br /> Final Environmental Impact Report (\ June 2008 <br />