Cemex Vernalis Quarry Mining and Reclamation Project <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Party Monitor Timing Sign Off <br /> Prohibitions,including implementation of all feasible control measures specified in the SJVAPCD's <br /> Guide for Assessing Air Quality Impacts. <br /> 4.6.2:While several emission-reducing measures are currently available,current proven technology limits Applicant CDD and SJVAPCD Prior to Phase I <br /> the maximum reductions.These operational impacts are a significant impact of the project after mitigation. (improvement plan <br /> The project proposes to operate new equipment,both on-site non-road equipment and haul trucks.This approval or mining <br /> provides the best available operating efficiency for the equipment.Currently,additional retrofits to reduce activity,whichever <br /> NOx emissions below acceptable emission standards would be cost-prohibitive.Catalytic particulate filters occurs first) <br /> and the use of ultra low sulfur fuels do not substantially reduce NOx emissions. <br /> 4.6.4a:The applicant shall either utilize new model year on-site machinery equipped with the best Applicant CDD Prior to Phase I <br /> available DPM control technology,or retrofit its fleet of excavators,on-site haul trucks,and front end (improvement plan <br /> loaders with catalyzed DPM filters to minimize DPM emissions,or,in those limited instances where approval or mining <br /> the retrofit would impede the function or life of the equipment,or presents safety concerns,the activity,whichever <br /> applicant shall comply with alternative measures developed by the Air Board. occurs first) <br /> 4.6.4b: Implement Mitigation Measure 4.6.1. Applicant CDD Prior to Phase I <br /> (improvement plan <br /> approval or mining <br /> activity,whichever <br /> occurs first) <br /> 4:7: GEOLOGY,SOILS,AND SEISMICITY <br /> 4.7.4:Earthquake Preparedness and Response Plan.Prior to commencement of mining,the Applicant CDD Prior to Phase I <br /> applicant staff shall complete an Earthquake Preparedness and Response Plan(EPRP)to address (improvement plan l <br /> worker safety and plant operation status during and following a major earthquake.The EPRP shall approval or mining <br /> be included or become a supplementary document to the standard site health and safety plan.The activity,whichever <br /> EPRP shall be prepared,implemented,and self-monitored by the applicant.The EPRP shall include occurs first) <br /> pre-earthquake and post-earthquake preparedness requirements for the facility that include: <br /> • Emergency evacuation routes to clear people of unsafe equipment and buildings, <br /> • Requirements for securing equipment likely to topple or undergo severe damage during an <br /> earthquake including procedures to avoid topple of furniture and small equipment, <br /> Communication protocol during and following an earthquake, <br /> • Location of emergency equipment and first aid, <br /> • Transportation routes, <br /> Cemex Vernalis Quarry Wring and RedEmalion Project 5-6 ESA 1203015 <br /> Final Envlronnn, ^1 Impad Report June 2008 <br />