Executive Summary <br /> TABLE ES-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> c. The construction of 6-to 8-foot solid fences or sound walls may <br /> be feasible(especially for some residences along Haul Route 3) <br /> and may be able to substantially reduce noise from haul trucks at <br /> some ofthe residences along the haul route. In such cases,the <br /> mine should compensate homeowners forthe fences or sound <br /> walls. However,for the residences on Segment 5(residence R9) <br /> and Segment 8(residence R10),fences or sound walls would <br /> probably not be practical or feasible. In these locations the <br /> homes are set back a considerable distance from the road and in <br /> order to reduce traffic noise to a less-than-significant level,sound <br /> walls would need to be too massive to be practical. Residence <br /> R10 on Segment 8 is also subjected to considerable existing <br /> noise from traffic on 1-5,so any sound wall on Blewett Road <br /> would be ineffective in reducing noise from 1-5. <br /> Air Quality <br /> 4.6.1 Project Construction-Related Emissions Impact.Project 4.6.1 The project applicant shall comply with SJVAPCO's Regulation VIII Less than Significant <br /> construction emissions would result in intermittent, control measures,and shall retain an onsite air quality monitor to <br /> temporary increases in air pollutant emissions.This ensure compliance with the SJVAPCD's Regulation VIII control <br /> impact is considered potentially significant. measures.The monitor must be familiar with the SJVAPCD <br /> Regulation VIII Fugitive PM10 Prohibitions,including implementation <br /> of all feasible control measures specified in the SJVAPCD's Guide for <br /> Assessing Air Quality Impacts. <br /> 4.6.2 Project Operational-Phase Emissions Impact.The 4.6.2 While several emission-reducing measures are currently available, Significant <br /> proposed surface mining of topsoil,sand and gravel current proven technology limits the maximum reductions.These <br /> would take place on approximately 659 acres within the operational impacts are a significant impact of the project after <br /> Project Site.The proposed mining operation would mitigation.The project proposes to operate new equipment,both on- <br /> consist of the extraction of 1.7 to 4.0 million tons per year site non-road equipment and haul trucks.This provides the best <br /> of aggregate materials(sand and gravel)over a 26-to available operating efficiency for the equipment.Currently,additional <br /> 60-year period.The operation would be open pit,sand retrofits to reduce NOx emissions below acceptable emission <br /> and gravel harvesting and processing.The impacts of standards would be cost-prohibitive.Catalytic particulate filters and <br /> operational air quality emissions of criteria pollutants are the use of ultra low sulfur fuels do not substantially reduce NOx <br /> potentially significant. (PS) emissions. <br /> 4.6.3 Project Odor Impact.The impact of odors from the project No mitigation is required. <br /> would be less than significant. (LS) <br /> Cemex varnaAa Quarry Mining and RedamaEpn Project ES-10 ESA 1203015 <br /> Final Environmenbl Impact Report <br /> une 2008 <br /> I I <br /> 1 _ I. - L _ 1 . I I __ L _ i _ 1.--_ L _-- l _- I I <br />