Laserfiche WebLink
Executive Summary <br /> TABLE ES-1 (CONTINUED) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> Environmental Impact Mitigation Measures Level of Significance <br /> (Level of Significance Prior to Mitigation) After Mitigation <br /> 4.7.2 Activities related to quarry operations that cause No mitigation is required. <br /> disturbance of surface soils would expose loose soil <br /> materials. Exposure of these soils to wind,rain,and <br /> concentrated runoff could cause localized erosion that <br /> could eventually damage the engineered earthen <br /> features. Erosion damage to these features could expose <br /> workers to injury and equipment to damage.This would <br /> be a less-than-significant impact.(LS) <br /> 4.7.3 Permanent reclamation slopes could be subjected to No mitigation is required. <br /> excessive soil erosion,resulting in riling,gullying,debris flows, <br /> and berm damage.This would be a less-than-significant <br /> impact given the project's erosion control plan.(LS) <br /> 4.7.4 In the event of a major earthquake,seismic ground 4.7.4 Earthquake Preparedness and Response Plan.Prior to Less than Significant <br /> shaking could potentially injure people and cause commencement of mining,the applicant staff shall complete an <br /> collapse or structural damage to proposed structures. Earthquake Preparedness and Response Plan(EPRP)to address <br /> This would be a potentially significant impact.(PS) worker safety and plant operation status during and following a major <br /> earthquake.The EPRP shall be included or become a supplementary <br /> document to the standard site health and safety plan.The EPRP shall <br /> be prepared, implemented,and self-monitored by the applicant.The <br /> EPRP shall include pre-earthquake and post-earthquake <br /> preparedness requirements for the facility that include <br /> • Emergency evacuation routes to clear people of unsafe equipment <br /> and buildings, <br /> • Requirements for securing equipment likely to topple or undergo <br /> severe damage during an earthquake including procedures to <br /> avoid topple of furniture and small equipment, <br /> • Communication protocol during and following an earthquake, <br /> • Location of emergency equipment and first aid, <br /> • Transportation routes, <br /> • List of on-site contacts, <br /> • Procedures to locate and account for on-site personnel, <br /> • List of current phone numbers for San Joaquin County sheriff and <br /> fire prevention,and City of Tracy Fire and Rescue,and <br /> • Post-earthquake facility structure and quarry pit inspections. <br /> Cemax Vernalis Quarry Mining and Reclama0on Project ES-12 ESA /203015 <br /> Final Environmental Impact Report June 2008 <br /> 1 1 1 _ L l _. 1 I <br />